2025 Long-Term Reliability Assessment (January 2026)
North American Electric Reliability Corporation (NERC)
NERC's 2025 LTRA: 13 of 23 assessment areas face resource adequacy challenges over 10 years, summer peak demand is forecast to rise 224 GW, and data centres account for most of the growth.
On this page
Overview
The North American Electric Reliability Corporation (NERC) assesses the 10-year resource adequacy outlook of the North American bulk power system (BPS) in the 2025 LTRA, published in January 2026. It covers 23 assessment areas, with inputs based on mid-2025 forecasts from load-serving entities (LSEs) and system planners. The result is a snapshot of the system as planned.
The main finding is that the overall outlook is worsening: 13 areas face resource adequacy challenges over the next 10 years. Resource and transmission growth lag what is needed for the demand forecasts driven by data centres and other large loads. Aggregate summer peak demand is forecast to rise by 224 GW over 10 years (69% above last year's 132 GW projection) and winter peak by 245 GW. New data centres for AI and the digital economy account for most of the increase.
On the resource side, battery storage and solar PV lead; together they make up two-thirds of Tier 1 and Tier 2 additions over 10 years, with natural gas at 15% and wind and hybrid at 8% each. Existing fossil capacity fell 21 GW from 2024 to 2025, while on-peak capacity from batteries, wind and solar grew 23 GW. Planned retirements exceed 105 GW over 10 years, about 10 GW lower than last year.
Risk is classified with probabilistic analysis (LOLH, normalised expected unserved energy) and reserve margin comparison. The high-risk threshold is annual LOLH above 2.4 hours or normalised EUE above 0.002% (20 ppm). The report also notes 41,000 miles (66,000 km) of transmission in development or construction, with at least 390 of nearly 900 projects delayed. Area chapters give detail for regions such as MISO, PJM, ERCOT and WECC.
Key points
- 13 of 23 assessment areas face 10-year resource adequacy challenges; areas such as MISO, PJM, ERCOT, SPP, NPCC-New England, SERC-East and WECC-Basin are classed as high or elevated risk.
- Aggregate summer peak demand is forecast to rise 224 GW over 10 years (last year: 132 GW); winter peak 245 GW.
- Data centres for AI and the digital economy account for most of North America's demand growth.
- In WECC areas, planned data centres average 10% of forecast demand, and up to 40% for some balancing authorities.
- Solar and battery additions are two-thirds of 10-year Tier 1 and Tier 2 resources; natural gas is 15%, wind and hybrid 8% each.
- Fossil capacity fell 21 GW in a year while on-peak capacity from batteries, wind and solar grew 23 GW.
- Planned retirements exceed 105 GW over 10 years (about 10 GW fewer than last year).
- High-risk criteria: annual LOLH above 2.4 hours, or normalised EUE above 0.002% (20 ppm), or a regulatory target not met.
- Texas lawmakers gave ERCOT authority to curtail new large loads.
- 41,000 miles (66,000 km) of transmission is in development; at least 390 of nearly 900 projects are delayed.
Using it in design
- For North American site selection, review the risk level and year of the relevant assessment area; in high-risk regions, settle contractual terms for connection date and curtailment likelihood early.
- In large-load interconnection, state load flexibility and operating characteristics (curtailable load, backup generation) explicitly in the application; LSE forecasts rely on this information.
- Take winter resource adequacy risk into account when choosing backup generator fuel storage and runtime.
- In regions where the grid operator can curtail large loads (for example ERCOT), include the partial load-shed and transfer-to-backup scenario in design and operating procedures.
- Remember that demand forecasts get revised; do not tie the project schedule to a single grid plan.
Who should read it
Investors, energy strategists and electrical designers planning data-centre siting and grid connection in North America.
Document contents
- Executive summary
- Capacity and energy risk assessment
- Resource and demand projections
- Demand trends and implications (data centres and large loads)
- Resource mix changes
- Transmission development and interregional transfer capability
- Regional assessment dashboards
- Methods and assumptions
- Recommendations and ERO actions summary
Publication details
- Authors
- North American Electric Reliability Corporation (NERC)
- Publisher
- North American Electric Reliability Corporation (NERC)
- Year
- 2026
- Document language
- English
- Source type
- Expert / community
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
NERC assessment; no open licence stated.
Citation
North American Electric Reliability Corporation (NERC) (2026). 2025 Long-Term Reliability Assessment (January 2026). North American Electric Reliability Corporation (NERC). https://www.nerc.com/pa/RAPA/ra/Reliability%20Assessments%20DL/NERC_LTRA_2025.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.