Walther-Präzision's CG-C series is a clean-break, low-pressure quick-connect coupling system with NW 6-16 nominal bores and working pressure up to 10 bar, presented for rack-mountable data-centre cooling modules and blind-mate uses.

On this page

Overview

The product page describes the CG-C series as a low-pressure clean-break (drybreak) quick-connect coupling system for direct installation in the customer's own systems, for water-based emulsions such as glycol-containing coolant. The valves close drip-free on disconnection and stay dry on both sides; during connection ingress of ambient air into the pipework is prevented.

Technical data: types CG-G06, CG-G09, CG-G12 and CG-G16; nominal bores NW 6, 9, 12 and 16; working pressure up to 10 bar depending on material; media cooling fluids and water; materials anodized aluminium, hard-coat anodized aluminium or stainless steel; seals optimised for the medium and operating temperature. Applications include automated connection of power modules to cooling circuits (railway), rack-mountable cooling elements in data centres and medical imaging.

The coupling is suited as a built-in, fail-safe component where the coupling state cannot be inspected directly (blind mating); on the nipple side a mounting sleeve gives automatic self-centring, while installation without it limits permissible angular and centre deviations. The page asks for manufacturer advice for coupling under residual pressure, pulsating pressure, non-lubricating media, highly viscous media, special cleanliness requirements and flow optimisation.

Key points

  1. Types CG-G06, CG-G09, CG-G12 and CG-G16; nominal bores NW 6, 9, 12 and 16.
  2. Working pressure is up to 10 bar depending on material.
  3. Materials: anodized aluminium, hard-coat anodized aluminium, stainless steel; seals chosen per medium and temperature.
  4. Clean-break valves close drip-free on disconnection and prevent air ingress into the pipework on connection.
  5. Fail-safe for blind-mate use; a mounting sleeve gives automatic centring.
  6. Manufacturer advice is requested for coupling under residual pressure, pulsating pressure, highly viscous media and special cleanliness needs.

Using it in design

  • For blind-mate rack cooling modules select the nominal bore (NW 6-16) from flow and pressure-drop needs.
  • Compare the 10 bar maximum working pressure with circuit pressure and pressure surges; consult the maker if pressure pulsates.
  • Verify body material (aluminium or stainless steel) and seal material for compatibility with the coolant fluid.
  • For blind mating reflect the mounting sleeve and permissible deviations in alignment and centring in the mechanical design.

Who should read it

Mechanical designers and product engineers selecting in-rack cooling module connectors.

Publication details

Authors
WALTHER-PRÄZISION
Publisher
WALTHER-PRÄZISION
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

WALTHER-PRÄZISION Series CG-C: Low-pressure clean-break quick-connect coupling system. WALTHER-PRÄZISION. https://www.walther-praezision.de/en/products/series-cg-c/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace