Data Center Projects: Project Management

Schneider Electric · Neil Rasmussen, Suzanne Niles

A Schneider Electric white paper (WP 141, 2011) that sets out a framework of project-management roles and relationships for data center design/build projects of any size.

On this page

Overview

The paper presents a framework of project-management roles and relationships usable for data center design and build projects of any size. Its focus is not technical calculation but how responsibilities are distributed. The authors stress consistent terminology, explicit assignment of every management role, tracking of dependencies among multiple suppliers, and clear responsibility handoffs that prevent gaps and duplicated effort.

The framework rests on four project phases: Prepare, Design, Acquire and Implement, with commissioning inside Implement. The paper is positioned as a complement to the standardized project-process papers that place commissioning in that phase; it is therefore a role-and-relationship layer on top of those, not a stand-alone process definition.

The concluding sidebar gives three keys to effective project management: consistent terminology, every role assigned and tracked, and managed coordination of supplier dependencies. The paper dates from 2011 and the record shows no schedule, cost or calculation method; its value is in helping a project team settle role and handoff questions at the start.

Key points

  1. Keys to effective project management: consistent terminology, every role assigned and tracked, managed coordination of supplier dependencies.
  2. Phases referenced: Prepare, Design, Acquire, Implement.
  3. Commissioning sits inside the Implement phase.
  4. The framework applies to data center projects of any size.
  5. Clear responsibility handoffs prevent gaps and duplicated effort.

Using it in design

  • In the project-workflow feature, provide a RACI template with roles per phase (Prepare/Design/Acquire/Implement/Operate).
  • Track supplier interface dependencies.
  • Keep it low priority relative to calculation features.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Bring standards pre-checks into your project

Review model-based TS EN 50600 and Tier pre-checks, missing inputs and items requiring engineering review in SoSo CAD.

Request a demo
Selected rule packs and findings in the SoSo CAD standards panel

Who should read it

Project managers setting up role and supplier coordination on data center projects.

Related standards

  • EN 50600-1

Publication details

Authors
Neil Rasmussen; Suzanne Niles
Publisher
Schneider Electric
Year
2011
Document number
WP 141
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Neil Rasmussen; Suzanne Niles (2011). Data Center Projects: Project Management. Schneider Electric. WP 141. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_SNIS-6VHRU8_EN

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.