A site preparation guide for Castrol DC 15 and DC 20 fluids giving storage conditions (up to 60°C), pack dimensions (20 L, 208 L, 1,000 L IBC), pallet weights and spill response.

On this page

Overview

The guide describes preparation before fluid arrives: space for pallet delivery, a spill kit, study of the safety data sheet and technical data sheets, personal protective equipment, and disposal in line with local law. For storage, packages are kept under cover; if outside storage is unavoidable drums are laid horizontally, and product is not kept above 60°C, in hot sun or in freezing conditions.

The packaging section gives dimensions: a 20 L pail (nominal 20 L, 295 x 235 mm base, 422 mm high with pallet), a 208 L metal drum (595 mm diameter, 882 mm high) and a 1,000 L IBC (1,200 x 1,000 mm, 1,160 mm high with pallet, about 55 kg empty). A filled DC 20 IBC is about 797 kg, a pallet of 20 L pails about 480 kg and a pallet of 208 L drums about 770 kg.

Best-practice items include PPE, avoiding ignition sources, grounding during bulk transfer, absorbent pads that do not make dust, a labelled waste container and a licensed waste contractor. For small spills wipe and degrease residual oil; for large spills use warning signs, absorbent booms and pads, and avoid vermiculite or sand.

Key points

  1. Product should not be stored above 60°C, in direct sun or in freezing conditions.
  2. Packs: 20 L pail, 208 L metal drum and 1,000 L IBC (1,060 L brimful).
  3. A filled 1,000 L DC 20 IBC weighs about 797 kg; a pallet of 20 L pails about 480 kg; a pallet of 208 L drums about 770 kg.
  4. An empty IBC is about 55 kg at 1,160 x 1,200 x 1,000 mm; the 208 L drum is 595 mm in diameter and 882 mm high.
  5. Bulk fluid transfer is grounded to prevent static charge build-up.
  6. For spills, dust-making vermiculite and sand are not recommended; absorbent pads, booms and degreaser are used.

Using it in design

  • Check the fluid delivery and storage area against pallet weights (480-770 kg) and the 797 kg filled IBC for floor loading.
  • Design the storage area for the temperature limit (below 60°C), shelter from sun and spill kit placement.
  • Plan grounding, ventilation and a waste-fluid collection container for the bulk transfer point.
  • Write the spill response plan with booms and pads for areas near floor drains.

Who should read it

Facility engineers and operations teams planning immersion fluid storage and transfer areas.

Document contents

  1. Site preparation
  2. Storage
  3. Packaging sizes of DC thermal management fluids
  4. Weight and dimensions of full pallets
  5. Fluid handling guidelines
  6. Spills

Publication details

Authors
Castrol
Publisher
Castrol
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official public manufacturer source inspected. No document-specific redistribution permission established. Metadata and original brief summaries only; local downloads are research evidence, not a redistribution package. Publicly linked PDF includes a confidentiality/non-disclosure statement on its final page. No full text is offered for redistribution.

Citation

Castrol Castrol ON Single Phase Immersion Cooling Fluids: Site preparation. Castrol. https://www.castrol.com/content/dam/castrol/business-sites-new/en/global/corporate/documents/product/castrol-on/castrol-on-immersion-cooling-fluids-site-preparation.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.