Americas Data Center Update H1 2026
Cushman & Wakefield · Cushman & Wakefield Research
Cushman & Wakefield's semi-annual update of 14 September 2026 on the Americas data center market, covering operational, under-construction and planned capacity.
On this page
Overview
This document is Cushman & Wakefield's semi-annual update on the Americas data center market, dated 14 September 2026. This freely available source summarises the latest state of capacity in the region and stresses that growth is increasingly shaped by local power allocation and regulation. The headline figures are as follows.
The Americas have 50.3 GW of operational capacity, 94.1% of it in the US. A record 37.7 GW is under construction, of which 91.7% is precommitted. Region-wide vacancy is 3.8%. The planned pipeline has expanded to 285 GW.
The document is a real-estate advisory market report; it provides context, not engineering design rules. The figures belong to the Americas market and should not be carried over directly to other regions. For a designer the meaning is that large campus-scale projects and long equipment lead times have become the norm in North America.
Key points
- 50.3 GW operational capacity in the Americas, 94.1% in the US.
- Record 37.7 GW under construction, 91.7% precommitted.
- Region-wide vacancy 3.8%.
- Planned pipeline expanded to 285 GW.
- Growth increasingly shaped by local power allocation and regulation.
- Semi-annual update dated 14 September 2026.
- Freely available source.
Using it in design
- Use as context only: it supports defaulting to large-campus templates in North American projects.
- Use long equipment lead-time assumptions for these projects.
- Treat the market figures as planning context, not design targets.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo
Who should read it
Developers, investors and design teams planning projects in North America.
Publication details
- Authors
- Cushman & Wakefield Research
- Publisher
- Cushman & Wakefield
- Year
- 2026
- Document language
- English
- Source type
- Expert / community
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note
Public web page; cited only.
Citation
Cushman & Wakefield Research (2026). Americas Data Center Update H1 2026. Cushman & Wakefield. https://www.cushmanwakefield.com/en/insights/americas-data-center-update
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.