The Top 9 Mistakes in Data Center Planning
Schneider Electric · Mike M. Hagan, John Lusky et al.
Schneider Electric WP 145 is a short practitioner checklist of nine recurring errors in planning new or expanded data centres, aimed especially at mid-size projects of 1-3 MW.
On this page
Overview
The authors argue for a total-cost-of-ownership model combining capital expense, operations and maintenance expense, and energy cost, with a 3-7 year O&M budget needed to build an ROI model. Design criteria should come from business goals and risk profile before a tier, site or space plan is chosen. The paper stresses that not everyone who wants a Tier 3 design needs one, that a 'must have 300 watts per square foot' requirement is often not justified by business needs, and that higher tiers raise O&M and energy cost.
On obsolescence, it cites IDC for an average data centre age of 9 years and Gartner for treating any site over 7 years old as obsolete. On space, in the most robust systems the ratio of raised floor to support (mechanical/electrical) space can be as high as 1 to 1, and office, equipment yards and staging areas are often overlooked. On flexibility, designs should allow adding UPS capacity to existing modules without an outage and uninterrupted addition of in-rack or in-row cooling for future high-density rollouts.
PUE claims must state the design day (perfect day versus yearly average) and the load level. Water is a separate line item: a typical 2 megawatt data centre using water-cooled towers needs 50 to 60,000 gallons of make-up water per day. Other pitfalls are underestimated build budgets, inflexible dead-end designs, treating LEED as an afterthought, and over-complex redundancy schemes that add failure points and human-error risk.
The paper is qualitative but contains a few useful planning ratios: PUE context, the support-space ratio and the make-up water figure. The numbers rest on one 2 MW example and cited analyst views, so they should not be read as universal thresholds.
Key points
- IDC puts the average data centre at 9 years old; Gartner calls any site over 7 years obsolete.
- TCO combines capital expense, O&M expense and energy cost; a 3-7 year O&M budget is needed for an ROI model.
- Not everyone wanting Tier 3 needs it; '300 watts per square foot' is often unjustified; higher tiers raise O&M and energy cost.
- In the most robust systems raised floor to support space can be as high as 1 to 1; offices, yards and staging areas are often overlooked.
- Designs should allow adding UPS capacity to existing modules without outage and uninterrupted addition of in-rack/in-row cooling.
- PUE claims must state the design day (perfect day vs yearly average) and load level.
- A typical 2 MW data centre with water-cooled towers needs 50-60,000 gallons of make-up water per day.
- Other mistakes: underestimated build budget, dead-end design, LEED as afterthought, over-complex redundancy.
Using it in design
- Require design criteria (tier, density, capacity) to be derived from stated business goals before site and space tools are used.
- In the space planner, estimate electrical and mechanical support space up to 1:1 with white space for high-redundancy designs, plus office, yard and staging areas.
- Always label PUE with its load fraction and whether it is annualized or a design-day value.
- For cooling-tower designs show daily make-up water beside PUE (roughly 25-30k gal/MW/day from the 2 MW example); build the TCO view as CapEx + multi-year O&M + energy, and warn when redundancy schemes add components without availability gain.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Assess redundancy through scenarios
Compare normal operation and equipment failures in SoSo CAD, with supplied loads and capacity shortfalls in one view.
Request a demo
Who should read it
Owners, investors and design managers planning new or expanded facilities in the 1-3 MW range.
Related standards
- ISO/IEC 30134-2
- LEED
Publication details
- Authors
- Mike M. Hagan; John Lusky; Tuan Hoang; Scott Walsh
- Publisher
- Schneider Electric
- Year
- 2012
- Document number
- WP 145
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Mike M. Hagan; John Lusky; Tuan Hoang; Scott Walsh (2012). The Top 9 Mistakes in Data Center Planning. Schneider Electric. WP 145. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_VAVR-8K4U25_EN
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.