White paperFree to read2024

Recommended Inventory for Data Center Scope 3 GHG Emissions Reporting

Schneider Electric · Paul Lin, Robert Bunger

Paul Lin and Robert Bunger narrow the GHG Protocol's 15 Scope 3 categories to nine relevant to IT resources and propose data-centre-specific subcategories.

On this page

Overview

The paper first defines Scope 1, 2 and 3 under the GHG Protocol and ISO 14064. Scope 1 includes onsite diesel generator operation, Scope 2 covers purchased electricity, heat, steam or cooling, and Scope 3 covers all other value-chain emissions. Two accounting rules apply: scopes are mutually exclusive within one organisation, but the same emissions may be counted again by another organisation in the value chain, as when a manufacturer's emissions become the buyer's upstream Scope 3.

The motivation is CDP 2019 data: supply-chain emissions average 5.5 times an organisation's Scope 1 and 2, and SBTi requires a Scope 3 target once Scope 3 exceeds 40% of the total. The 15 WRI/WBCSD categories are cut to nine: purchased goods and services, capital goods, fuel- and energy-related activities, upstream transport, waste, business travel, employee commuting, upstream leased assets and downstream leased assets. Each is described separately for on-premise, colocation and cloud IT.

Capital goods split into IT, power, cooling and other equipment (rack, fire protection, lighting). Switchgear and transformers last 20-30 years, servers 3-5, and cradle-to-gate emissions are booked in the acquisition year rather than depreciated. Transmission and distribution losses of around 5% (US EIA) fall under Scope 3 Category 3; generator fuel's upstream emissions are Scope 3 while combustion is Scope 1. Organisations without on-premise data centres should prioritise cloud services, leased colocation space and, for providers, multi- or single-tenant data centres.

Key points

  1. CDP 2019: supply-chain emissions average 5.5 times Scope 1 and 2; SBTi requires a Scope 3 target if Scope 3 exceeds 40% of total emissions.
  2. Scope 1 includes onsite diesel generator operation, Scope 2 purchased electricity, heat, steam or cooling, Scope 3 all other value-chain emissions.
  3. Scopes are mutually exclusive within an organisation, yet the same emissions can be counted by different organisations (a manufacturer's emissions as the buyer's upstream Scope 3).
  4. The 15 categories are narrowed to nine for IT: goods and services, capital goods, fuel and energy, upstream transport, waste, business travel, commuting, upstream leased assets, downstream leased assets.
  5. Switchgear and transformers last 20-30 years, servers 3-5; cradle-to-gate emissions are booked in the acquisition year, not depreciated.
  6. T&D losses are around 5% (US EIA) under Scope 3 Category 3; generator fuel purchase is Scope 3, combustion Scope 1.
  7. Without on-premise data centres, prioritise cloud services (Cat. 1), leased colocation space (Cat. 8) and, for providers, multi-/single-tenant data centres (Cat. 9).

Using it in design

  • Structure embodied and operational carbon outputs by the nine categories of Table 2; map bill-of-materials lines to Category 2 subcategories (IT, power, cooling, other) and building materials to Category 1 core and shell.
  • Book each phase's embodied carbon in its installation year without amortisation, and re-book on replacement using the catalogue expectedLifeYears (switchgear/transformers 20-30, servers 3-5).
  • Split generator fuel into upstream (Scope 3 Cat. 3) and combustion (Scope 1); for grid power add a configurable ~5% T&D-loss uplift in Scope 3 Cat. 3 on top of Scope 2, and support both location-based and market-based factors.
  • For colocation designs, produce per-tenant allocation outputs for Cat. 8/9 reporting.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Compare the cost of design decisions

Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.

Request a demo
CAPEX and TCO estimates in the SoSo CAD cost workspace

Who should read it

Engineers and ESG leads building data-centre emissions inventories and embodied-carbon calculations.

Related standards

  • GHG Protocol Corporate Value Chain (Scope 3) Standard
  • ISO 14064

Publication details

Authors
Paul Lin; Robert Bunger
Publisher
Schneider Electric
Year
2024
Document number
WP 53
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Paul Lin; Robert Bunger (2024). Recommended Inventory for Data Center Scope 3 GHG Emissions Reporting. Schneider Electric. WP 53. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_WP53_EN

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.