Ministerio de Ciencia, Tecnología, Conocimiento e Innovación, Chile, 2024, Guide or technical publication
Chile's National Data Centre Plan (PDATA) 2024-2030, from the Ministry of Science, sets eight measures for an industry at 198 MW installed: a permit guide, SEIA environmental criteria, clean producti…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Planning Institute of Australia, 2026, Guide or technical publication
The Planning Institute of Australia's 2026 guidance note ties data-centre scale to site suitability and assessment evidence, and suggests operating conditions for noise, generator tests, water use…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
PLANMalaysia, Ministry of Housing and Local Government, 2024, Guide or technical publication
PLANMalaysia's 2024 guideline links site hazards, utility consultation and planning submission routes for new sites and building conversions, calling for consultation with TNB and water authorities…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
International Telecommunication Union (ITU-T), 2025, Guide or technical publication
ITU-T Recommendation L.1308 (December 2025) advises new low-carbon data centres to target an annual PUE of 1.3 in cool and 1.4 in warm climates, with a 75% renewable energy factor.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
International Telecommunication Union (ITU-T), 2024, Guide or technical publication
ITU-T L.1327 (August 2024) defines a selection method that matches data centre cooling technology to climate, building storey count and business scenario (below 7 kW, 7 to 15 kW, 15 to 50 kW per rack…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Netherlands Enterprise Agency (RVO), Year not stated, Guide or technical publication
The Netherlands Enterprise Agency RVO's data-centre heat-reuse page describes four arrangements with Dutch examples: a local heat-cold ring, direct supply nearby, direct internal use and indirect…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Open Compute Project Foundation, 2024, Guide or technical publication
A short two-page OCP guide written for municipal planners on enabling data-centre heat reuse. It summarises offtake uses, barriers and the steps local authorities can take, and is useful for planning…
Guide or technical publication
2024
PDF
Swiss Re Institute, 2026, Guide or technical publication
Swiss Re Institute's Sigma Insights 07/2026 looks at concentrated asset value in large AI data centres and the physical risks from natural hazards, cooling-water damage, power continuity and on-site…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Bureau of Energy Efficiency / Confederation of Indian Industry, Year not stated, Guide or technical publication
The Karnataka plan, prepared by CII for BEE, sets sector strategies to 2031; its data-centre strategy takes PUE from 2.0 to 1.5 (moderate) or 1.2 (ambitious) for savings of 0.08 to 0.12 MTOE.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
CPSE Center for Innovation, 2026, Guide or technical publication
A CPSE survey of November 2026: of 122 US fire chiefs, 68% say data-centre growth will require significant changes to fire department planning, and 90.5% are concerned about lithium-ion fires and…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Texas Legislature, 2025, Guide or technical publication
Texas law signed on 20 June 2025 setting rules for large loads (75 MW and above by default) connecting to the ERCOT grid.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Norwegian Ministry of Digitalisation and Public Governance, 2025, Guide or technical publication
Norway's data-centre strategy, published by the Ministry of Digitalisation and Public Governance on 7 October 2025, links data-centre development to national value creation, security, preparedness…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Next10 / Santa Clara University, 2026, Guide or technical publication
A May 2026 Next10 and Santa Clara University report that maps California data centres against water scarcity and social vulnerability indices, with five case studies exposing a transparency gap.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
State of Victoria, Department of Jobs, Skills, Industry and Regions, 2026, Guide or technical publication
Victoria's 2026 action plan coordinates land, grid, water and local-benefit expectations for data centres: operational electricity should be offset by new renewable supply and storage, and water-inte…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
UK Government (GOV.UK), 2025, Guide or technical publication
UK policy paper (July 2025) setting the national plan for AI compute and data-centre infrastructure.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Ahiler Kalkınma Ajansı, 2024, Guide or technical publication
Ahiler Development Agency's November 2024 study puts the initial cost of a Nevşehir underground (cave) data centre at an average of US$9.24 million, with Ankara 22% and Istanbul 45% higher and the…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Open Compute Project Foundation, 2026, Guide or technical publication
Summarises a Google and UC Davis framework used to decide whether a novel low-carbon cement or concrete should be incubated, piloted or deployed in data centre construction. It is a reference for…
Guide or technical publication
2026
PDF
Cushman & Wakefield, 2026, Guide or technical publication
Cushman & Wakefield's annual ranking of 107 global data centre markets across 24 variables, emphasising power availability, grid stability and policy.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Cushman & Wakefield, 2026, Guide or technical publication
Cushman & Wakefield's semi-annual update of 14 September 2026 on the Americas data center market, covering operational, under-construction and planned capacity.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Consulting-Specifying Engineer, 2016, Guide or technical publication
Mark Jason Aaby's article explaining the scope and structure of NFPA 75 and how its risk-assessment basis, construction and fire protection chapters apply to IT equipment rooms.
Guide or technical publication
2016
Read at publisher (opens in a new tab)↗
Cushman & Wakefield, 2026, Guide or technical publication
Cushman & Wakefield's 2026 guide to all-in data center development costs in the US, reporting average greenfield cost per MW and the shift of the pipeline to secondary markets.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
7x24 Exchange Magazine, 2025, Guide or technical publication
This 7x24 Exchange Magazine piece outlines the structural issues specific to data centers: high floor loads, multi-storey halls with stacked generators, lateral force systems that must leave large…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Turner & Townsend, 2025, Guide or technical publication
Press release summary of Turner & Townsend's annual benchmark of data centre construction cost per watt across 52 markets.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Turner & Townsend, 2026, Guide or technical publication
Turner & Townsend's tenth annual index (October 2026) gives indicative construction cost per watt for 62 markets; US AI-ready facilities cost about 10% more than traditional builds.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗