The Green Grid 2014
WP#62 - Data Center Environmental Impacts
In a sustainability scorecard, group indicators into impact categories.
- Dated 11 December 2014.
The engineer’s reference desk
793–816 / 1,044 sources
The Green Grid 2014
In a sustainability scorecard, group indicators into impact categories.
The Green Grid 2015
Offer a reduced-conversion topology scenario.
The Green Grid 2015
At project setup, let users tag a facility with a workload archetype (for example HPC/AI, enterprise, cloud, storage).
The Green Grid 2015
In the airflow advisor, estimate fan and chiller savings from containment and blanking (bypass and recirculation reduction).
The Green Grid 2016
Store PSU ride-through (ms) as a catalog field for IT equipment.
The Green Grid 2016
In airflow/CFD results, report thermal conformance (share of IT inlets within the recommended range) alongside PUE.
Monthly newsletter · free
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
The Green Grid 2016
Catalog the ride-through time per PSU.
The Green Grid 2016
In the liquid cooling module, use consistent boundary terms (FWS/TCS loops, CDU).
The Green Grid 2016
In the reliability module, alongside Tier/EN 50600 classes, offer an availability-based rating that credits on-site renewables and alternative topologies.
The Green Grid 2017
Add an optional IT-capacity panel: store compute, storage and network capacity and average utilisation per hall.
The Green Grid 2017
Add catalog fields for quick disconnects: Cv or pressure drop at flow, drip volume per disconnect and filtration (micron) requirement.
The Green Grid 2017
In IT load planning, allow an unused-server fraction.
The Green Grid 2017
In the server catalogue, store the SERT active-efficiency score together with idle power.
The Green Grid 2017
In capacity planning, track ITE power utilisation (actual versus provisioned) per rack and hall.
The Green Grid 2018
In the CDU catalog, hold capacity (kW) at approach temperature, flow, pump head and redundancy.
The Green Grid 2019
Export: provide asset/topology exports (racks, power chain, sensors) in a DCIM-ready format so designs can seed staged DCIM deployment.
The Green Grid 2020
In the server catalogue, store the declared operating condition class (A1-A4).
The Green Grid 2021
In the IT load profile, provide an idle/low-utilisation power factor that depends on whether CPU power management is enabled.
The Green Grid 2022
For EU sites, default server PSU efficiency to the Lot 9 (Regulation (EU) 2019/424) minimum.
The Green Grid 2022
In the storage catalog, capture power per capacity or performance from SNIA Emerald-style test data rather than nameplate.
The Green Grid 2023
Add a 480Y/277 V-to-rack option with 277 V PSUs and no PDU transformer to the electrical topology library.
The Green Grid 2023
For EED reporting, prepare to compute work capacity from SERT-derived values (see WP#94).
The Green Grid 2024
In the EED reporting export, include a Cserv field computed from PerfCPU per server SKU.
The Green Grid 2025
In the server catalogue, add CPU SKU and PerfCPU fields.