Explore publications on data centre electrical infrastructure, from power distribution and protection to supply architectures and capacity planning. Compare technical summaries, publication details and links to the original references.

Sources
358
Downloadable PDFs
74
Years
1984–2027

All sources

337–358 / 358

Technical guidePDF

U.S. DoD (UFC) 2023

UFC 3-540-01 Engine-Driven Generator Systems for Prime and Standby Power Applications (1 August 2014, Change 3, 26 January 2023)

Include transient and steady-state loads, transformer inrush, motor starting and UPS load in the generator sizing study, and calculate UPS charging load using the minimum charging current allowed while on generator.

  • Harmonic analysis is required when switching power supplies make up 25% or more of the system load.
Technical guidePDF

U.S. DoD (UFC) 2019

UFC 3-550-01 Exterior Electrical Power Distribution (1 September 2016, Change 3, 01 November 2019)

Settle the loop or alternate-feed arrangement and the maintenance isolation points for the MV run from utility entry to the building early; the text treats shortening maintenance outages as a direct design driver.

  • Elbow-type arresters go at the ends of all radials and at normally open loop points, for all voltages above 5 kV.
Technical guideFree to read

Uptime Institute 2026

Uptime Institute Tier Classification System

Model 'reliability.target' as an enum {TierI..TierIV} driving topology defaults: Tier I single path N; Tier II N+1 capacity components, single path; Tier III N+1 components AND two distribution paths (one may be passive), concurrently maintainable; Tier IV 2N or 2(N+1), two active physically compartmentalized paths and continuous cooling with UPS-backed pumps/fans.

  • Over 4,300 Tier Certification awards in 120+ countries (2026).
White paperPDF

Open Compute Project Foundation 2026

White Paper: Requirements for Energy Storage Systems Used in Data Centers, Revision 1.0, Version 1.0 (OCP Ready Facilities, January 2026)

Fix the ESS architecture (DC or AC coupled, distributed or centralised, backup-only or grid-interactive), write the applicable NFPA 70, NFPA 855 and IEC 62933 parts into the design basis, and consult the authority having jurisdiction (AHJ) early.

  • FM Global DS 5-33 (as cited) recommends battery installations in rooms with at least a 2-hour fire rating.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.