Topic guide

Electrical

Explore publications on data centre electrical infrastructure, from power distribution and protection to supply architectures and capacity planning. Compare technical summaries, publication details and links to the original references.

Sources
358
Downloadable PDFs
74
Years
1984–2027

All sources

73–96 / 358

Research paperPDF

WSEAS TRANSACTIONS ON POWER SYSTEMS (World Scientific and Engineering Academy and Society (WSEAS)) 2026

Design and Prototype of a Microgrid for Enhancing Reliability of Power Supply for Artificial Intelligence Data Centers

Follow the energy-balance chain in a PV/BESS sizing helper (daily load split, conversion losses, usable depth of discharge, power rating against night peak); report usable-energy duration rather than nameplate duration and make DoD an explicit input.

  • Covering 60% of demand needs 81,857 kWh/day from PV after 5% DC-AC and 10% battery losses.
Technical guideFree to read

ABB 2008

Directional protection and directional zone selectivity

For main switchboards with two transformers plus bus tie, or generator paralleling boards, flag that conventional time selectivity cannot discriminate fault direction and propose directional or directional-zone selectivity on incomers and bus tie.

  • Without auxiliary power it degrades to plain directional protection with t7FW/t7BW times.
Technical guidePDF

U.S. Department of Energy / Federal Register 2025

Accelerating Speed to Power/Winning the Artificial Intelligence Race: Federal Action To Rapidly Expand Grid Capacity and Enable Electricity Demand Growth (Request for Information, September 18, 2025)

When planning a large load connection, query the interconnection queue, transmission congestion and reconductoring potential for the relevant grid region early.

  • The RFI cites Executive Orders 14154, 14179, 14262 and 14302.
Technical guideFree to read

Consulting-Specifying Engineer 2015

Driving data center PUE, efficiency

Include economizer control limits, part-load loss curves for each electrical stage and the redundancy topology as energy model inputs.

  • Water-cooled IT still rejects roughly 10-30% of cabinet capacity to air; such cabinets typically house 50-80 kW.
White paperFree to read

Schneider Electric 2015

Electrical Distribution Equipment in Data Center Environments

In the single-line editor define node types for MV switchgear, MV/LV transformer, LV switchboard/ATS, UPS input/output/distribution boards, STS, PDU, RPP, busway, panelboard and rack PDU, each with rated voltage, rated current, breaking capacity (kAIC/Icu) and withstand rating (SCCR/Icw).

  • MV switchgear marks the service entrance above 1 MW IT load; LV switchgear/switchboard marks it below 1 MW.
RegulationFree to read

T.C. Enerji ve Tabii Kaynaklar Bakanlığı 2000

Elektrik Kuvvetli Akım Tesisleri Yönetmeliği (Turkish Regulation on Power Installations)

In the MV module (TR profile), select transformer primary protection automatically: fused load-break switch up to 400 kVA, fused load-break switch or relay-operated breaker up to 1,600 kVA, relay-operated breaker above.

  • Apparatus must be type-tested to applicable TS, otherwise EN, HD, IEC or VDE in that order (Article 10).

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.