Thailand Office of the Board of Investment, 2026, Guide or technical publication
The 2026 guide sets out eligibility conditions for high-efficiency data centre incentives: energy performance, service continuity and water planning. Activity 8.2.1.1 requires PUE not to exceed 1.3…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Umweltbundesamt, 2025, Guide or technical publication
Germany's Federal Environment Agency (UBA) April 2025 guide builds on Blue Angel DE-UZ 228: for data centres commissioned after 2024 it recommends PUE ≤ 1.25 and CER > 9 as tender criteria.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
U.S. Department of Energy, FEMP, 2025, Guide or technical publication
A 2025 U.S. DOE FEMP addendum explaining how to measure and verify data-centre savings in performance-based energy contracts, adding nine data-centre-specific measures.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Japan Data Center Council, Year not stated, Guide or technical publication
This Japan Data Center Council (JDCC) page separates its facility-level PUE guideline from operator-level benchmark reporting; the target level is set for fiscal year 2030.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
EnergieSchweiz, Bundesamt für Energie, Year not stated, Guide or technical publication
EnergieSchweiz planning guide for cantons and municipalities: Schaffhausen requires PUE+ of at most 1.20 within three years of commissioning, and up to 80% of a data centre's electricity could be…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Österreichische Energieagentur, Energieeffizienz-Monitoringstelle, 2025, Guide or technical publication
Describes the data centre reporting scope, the reporting platform and how it relates to European efficiency reporting and voluntary environmental schemes. Scope starts at 500 kW of installed IT elect…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Agency for Natural Resources and Energy, METI, Year not stated, Guide or technical publication
The Japanese Agency for Natural Resources and Energy (METI) FAQ clarifies data-centre business types, tenant energy allocation and implementation details of efficiency reporting that are not yet dete…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Publications Office of the European Union / Joint Research Centre, 2024, Guide or technical publication
The 2024 JRC proceedings collect nine papers from the March 2024 Frankfurt conference; the data-centre paper shows an edge data centre carrying a 20 A load while limiting grid draw to 16 A.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
North American Electric Reliability Corporation (NERC), 2026, Guide or technical publication
NERC's 2025 LTRA: 13 of 23 assessment areas face resource adequacy challenges over 10 years, summer peak demand is forecast to rise 224 GW, and data centres account for most of the growth.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Ministry of Industry and Information Technology, China, 2025, Guide or technical publication
Notice from China's Ministry of Industry and Information Technology and five other agencies (工信厅联节函〔2025〕279号): voluntary nomination requires at least one year of stable full-system operation and…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
International Renewable Energy Agency (IRENA), 2026, Guide or technical publication
IRENA's May 2026 report measures the cost of round-the-clock solar, wind and battery power with a firm LCOE: about USD 54-82/MWh in favourable regions in 2025, falling below USD 50/MWh by 2035.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
RAND, 2026, Guide or technical publication
RAND report RR-A5050-1 presents a quantitative model that ranks 31 candidate federal locations for a 1 GW data centre under four generation scenarios by energy infrastructure cost and readiness.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
UK Government (GOV.UK), 2025, Guide or technical publication
UK government plan (13 January 2025) for AI adoption and infrastructure.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
EirGrid and SONI, 2026, Guide or technical publication
EirGrid and SONI 10-year report: Ireland is outside its 3-hour LOLE reliability standard in 2026-2028, and data centre and new technology load rises from 959 MVA in 2024 to 1,870 MVA by 2035 in the…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Danish Energy Agency (Energistyrelsen), 2026, Guide or technical publication
Danish Energy Agency note (October 2026): data-centre electricity demand is projected from a maturity-weighted Energinet grid-connection pipeline and a European market-share model, cutting the long-t…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
U.S. Government Accountability Office (GAO), 2025, Guide or technical publication
A US Government Accountability Office technology assessment of 22 April 2025 reports that US data centres used about 4% of US electricity in 2022 and could reach about 6% by 2026.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Building and Construction Authority / IMDA, 2024, Guide or technical publication
Singapore's BCA and IMDA GMDC:2024 beta requires energy modelling at 25%, 50%, 75% and 100% IT load for new facilities, twelve months of PUE data for existing ones, and permanent cooling measurement.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
BEAM Society Limited, 2021, Guide or technical publication
The BEAM Society's 2021 manual defines a voluntary green-building assessment for existing data centres in Hong Kong; operating PUE of 2.0 earns 1 credit, 1.6 earns 8, with 1 more bonus at 1.5 and 2…
Guide or technical publication
2021
Read at publisher (opens in a new tab)↗
RVO / Certios B.V., Year not stated, Guide or technical publication
A 12 October 2020 LEAP report by Dr. D.H. Harryvan (Certios) for RVO surveys data-centre technologies at TRL 6 or higher that could join Dutch recognised measures lists (EML), including UPS efficienc…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Natural Resources Canada, 2024, Guide or technical publication
Natural Resources Canada's November 2024 guide separates the responsibilities of enterprise operators, colocation providers and colocation customers and adapts EU best practices to the Canadian marke…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
İSKİD / Birol Kılkış, 2021, Guide or technical publication
A 2021 İSKİD seminar presentation by Prof. Birol Kılkış that compares cogeneration and trigeneration cases by first- and second-law efficiency and proposes RUE and RUEX instead of PUE for data centre…
Guide or technical publication
2021
Read at publisher (opens in a new tab)↗
Uptime Institute, Year not stated, Guide or technical publication
An Uptime Institute report proposing work-capacity calculation methods for accelerated AI servers and storage; authored by Jay Dietrich, it does not replace legal reporting rules.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Electrical and Mechanical Services Department, Hong Kong, 2025, Guide or technical publication
Hong Kong EMSD's 9-page energy audit code: at least 12 months of bill data, a five-step audit, EUI calculation, the CBSI definition for a data-centre portion and a 400 A three-phase exemption limit.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Electrical and Mechanical Services Department, Hong Kong, 2024, Guide or technical publication
The 88-page building energy code of the Hong Kong Electrical and Mechanical Services Department (EMSD); for data centre design the most relevant part is section 7: distribution losses, power quality…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗