Technical guidePDF

Open Compute Project Foundation 2023

Cold Plate Cooling Loop Requirements, Rev 2

Require each vendor to fill in the parameters of importance tables for cold plates, hoses, quick disconnects, loops, manifolds and CDUs so offers can be compared.

  • Glycol at 25% or above prevents bacterial growth; dielectric fluids are insulating but cost more and have higher GWP.
Technical guidePDF

European Commission JRC 2020

Development of the EU Green Public Procurement (GPP) Criteria for Data Centres, Server Rooms and Cloud Services - Final Technical Report (JRC118558, EUR 30251 EN, 2020)

Ask in the specification for a designed PUE (dPUE) at a stated IT load (for example 50%) and conditions, under ISO/IEC 30134-2 or EN 50600-4-2, and write PUE demonstration at handover and the commissioning test into the contract.

  • ASHRAE liquid cooling classes cited: W1 2-17 °C, W2 2-27 °C, W3 2-32 °C, W4 2-45 °C, W5 above 45 °C.
Technical guidePDF

U.S. EPA / ENERGY STAR 2024

ENERGY STAR Program Requirements for Computer Servers, Version 4.0 (Partner Commitments, Eligibility Criteria, and Final Test Method Rev. April 2023)

Write ENERGY STAR Version 4.0 certification and the PSU efficiency steps (at 10% to 100% load points) into the server procurement specification; look especially at 10% and 20% load efficiency for redundant supplies that run lightly loaded.

  • EffACTIVE = EXP(0.65 ln EffCPU + 0.30 ln EffMEMORY + 0.05 ln EffSTORAGE).
Technical guidePDF

Open Compute Project Foundation 2025

Modular Technology Cooling System for "Cloud Scale": Design & Delivery of Liquid to Rack Distribution Systems, Version 1.0 (25 August 2025)

When sizing TCS capacity against electrical capacity, state the cold-plate capture fraction (70-80%) and target delta-T (10 or 20 C) explicitly, and use the roughly doubled delivery at 20 C (4,845 versus 2,422 kW) as design headroom.

  • Most IT equipment is designed for a 10 C coolant delta-T, with some designs considering 20 C.
Technical guidePDF

Open Compute Project Foundation 2026

OCP Cooling Environments: Cold Plate Sub-Project Design Specification, Universal Quick Disconnect (UQD), v2.0.0 (effective September 22, 2026)

Select size (02-08) by rack or server loop flow: rated flows run from 2.27 to 17.79 L/min; estimate pressure drop from the Cv range and ask for correction or extra testing where the fluid differs from water.

  • Cv ranges: 0.30-0.43 for size 02, 1.1-1.6 for 04, 2.2-3.3 for 06 and 3.6-5.6 for 08.
Technical guidePDF

Open Compute Project Foundation 2020

Design Guidelines for Immersion-Cooled IT Equipment, Revision 1.0 (December 2020)

Compare the bill of materials of a server to be immersed (cable jackets, heat-shrink, EPDM capacitors, CMOS battery, relays, thermal paste) against the paper's problem table and obtain a compatibility statement from the fluid supplier for each item.

  • In Soxhlet extraction testing, a mass loss below 2% indicates good material compatibility; the 48-hour test gives worst-case results.
Technical guidePDF

Open Compute Project Foundation 2022

Open Rack V3 Base Specification, Revision 1.0

In rack delivery and placement planning, check the 10-degree entry and 15-degree exit ramp angles, the 25.4 mm floor gap and the 4 mm step as rolling limits, and obtain door and shipping dimensions from the rack vendor separately.

  • The rack supports 48 mm OpenU or 44.45 mm EIA-310-D rack unit pitch.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.