Lawrence Berkeley National Laboratory (Center of Expertise for Energy Efficiency in Data Centers) / U.S. DOE FEMP 2020
Data Center Master List of Energy Efficiency Measures, Version 2.0 (September 2020)
Compare the planned UPS module count and redundancy scheme against the load curve: check the per-unit load at day-one and at full build, and consider modular units or switching off surplus modules.
- Variable-speed chillers usually peak at 60-80% of full load; constant-speed chillers peak at full load.