Susquehanna River Basin Commission, Year not stated, Guide or technical publication
A Susquehanna River Basin Commission (SRBC) page explaining approval routes for data-centre withdrawal and consumptive use; an ABR(e) approval is needed above 20,000 gallons per day (30-day average)…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
U.S. Environmental Protection Agency, 2026, Guide or technical publication
US EPA's January 2026 guidance EPA-540-S-26-001: criteria for evaluating Superfund and Brownfield sites for data centres, including at least 100 acres for a 100 MW campus, 2-5% slope, flood zone and…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Direction générale des Entreprises, 2025, Guide or technical publication
France's DGE guide (November 2025) helps local authorities and project owners site data centres: grid connection takes 2-3 to 6-9 years, large projects average 50-250 MW, and operations create about…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Thailand Office of the Board of Investment, 2026, Guide or technical publication
The 2026 guide sets out eligibility conditions for high-efficiency data centre incentives: energy performance, service continuity and water planning. Activity 8.2.1.1 requires PUE not to exceed 1.3…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
PLANMalaysia Johor, 2024, Guide or technical publication
PLANMalaysia Johor's April 2024 guidelines split data centres into 1-5, 5-20 and 21-100 MW scales and set commercial-zone rules of at least 2 acres, 6 floors or 27 m height, 12 m setbacks and a 50 m…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
South Africa Department of Communications and Digital Technologies, 2024, Guide or technical publication
South African policy for data and cloud infrastructure, covering resource constraints, government hosting and continuity. The infrastructure section calls for backup water and electricity because of…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Iowa Department of Natural Resources, Year not stated, Guide or technical publication
Iowa Department of Natural Resources web guide: there is no single data-centre permit; withdrawals of 25,000 gallons or more per 24 hours, air, stormwater, wastewater and floodplain each need their…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
UK Government, 2026, Guide or technical publication
The UK government's Data Centre Covenant: a target of 6 GW of AI data centre capacity by 2030, PUE of 1.3 or better for new facilities, and priority grid connection for strategic data centres.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Abu Dhabi Department of Energy, 2022, Guide or technical publication
The Abu Dhabi Department of Energy policy (DoE/ED/G05/005), effective 1 September 2022, allows recycled, potable and sea water for district cooling towers and sets six objectives.
Guide or technical publication
2022
Read at publisher (opens in a new tab)↗
Ministerio de Ciencia, Tecnología, Conocimiento e Innovación, Chile, 2025, Guide or technical publication
Chile's Ministry of Science guide (June 2025) lists energy feasibility, land use and permits for data-centre installation: environmental declaration (DIA) 12-18 months, building permit 6-8 months…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
U.S. Government Accountability Office (GAO), 2025, Guide or technical publication
A US Government Accountability Office technology assessment of 22 April 2025 reports that US data centres used about 4% of US electricity in 2022 and could reach about 6% by 2026.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Building and Construction Authority / IMDA, 2024, Guide or technical publication
Singapore's BCA and IMDA GMDC:2024 beta requires energy modelling at 25%, 50%, 75% and 100% IT load for new facilities, twelve months of PUE data for existing ones, and permanent cooling measurement.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
BEAM Society Limited, 2021, Guide or technical publication
BEAM Society Limited's September 2021 green-building assessment manual for new Hong Kong data centres: energy carries 40% of the weighting, design PUE is scored from 1.77 to 1.52, and the prerequisit…
Guide or technical publication
2021
Read at publisher (opens in a new tab)↗
Climate Neutral Data Centre Pact (CNDCP), 2025, Guide or technical publication
The Pact's 2025 initiative sets PUE of 1.3 (cool) and 1.4 (warm climates) for new data centres above 50 kW, and matching electricity with 75% clean energy by end-2025 and 100% by 2030.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Climate Neutral Data Centre Pact (CNDCP), 2024, Guide or technical publication
The CNDCP's 2021 workshop proposal sets a location-dependent maximum WUE with WUEmax = K0 x K1 x K2 x K3; the target is 0.4 L/kWh for potable water, cool climate and high water stress.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
American Water Works Association / Carollo Engineers, 2026, Guide or technical publication
A 2026 AWWA report with Carollo Engineers that gives water utilities criteria for judging each data-centre project on demand, supply reliability, financial exposure and public communication.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
American Water Works Association, 2025, Guide or technical publication
AWWA's October 2025 report on data-centre impacts on water utilities (demand, infrastructure, cost, energy, regulation) with an eight-point planning framework; direct consumption is projected from…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Servicio de Evaluación Ambiental, Chile, 2026, Guide or technical publication
Chile's Environmental Assessment Service (SEA) first-edition criterion of January 2026: SEIA entry for data centres is case by case, mainly through hazardous substances (80,000 kg) and secondarily…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Monroe County Planning Commission, 2026, Guide or technical publication
The Monroe County Planning Commission guide in Pennsylvania recommends assessing utility plans, emergency service capability and environmental review processes before a proposal arrives.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Congressional Research Service, 2025, Guide or technical publication
US Congressional Research Service report R48646 (26 August 2025): US data centres used about 176 TWh in 2023, 4.4% of US electricity, and could double or triple by 2028 to reach up to 12%.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Congressional Research Service, 2026, Guide or technical publication
A July 2026 Congressional Research Service report answering questions on data-centre water use, sources, discharges and the federal and state regulatory framework.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Virginia Joint Legislative Audit and Review Commission (JLARC), 2024, Guide or technical publication
The Virginia Joint Legislative Audit and Review Commission's Report 598 (December 2024) reviews the economic, utility and local impacts of Virginia data centres and presents policy options.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
NITI Aayog, Frontier Tech Hub, 2026, Guide or technical publication
NITI Frontier Tech Hub's October 2026 working paper: common criteria and minimum approval documents for Indian states to evaluate data centre proposals across five pillars (power, water, siting and…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Ministry of Electronics and Information Technology, India, 2026, Guide or technical publication
Reply of India's Ministry of Electronics and Information Technology in the Rajya Sabha on 6 February 2026: PUE benchmarks, the BEE Star Rating Programme, ECBC and state water permissions apply to AI…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗