Australian Department of Industry, Science and Resources, 2026, Guide or technical publication
The Australian Department of Industry, Science and Resources' national expectations link additional clean energy, grid flexibility, water resilience and infrastructure costs to data centre developers.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Australian Department of the Prime Minister and Cabinet, 2026, Guide or technical publication
Consultation paper on future national obligations for large data centres and AI training.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Ministry of Electronics and Information Technology / Press Information Bureau, India, 2026, Guide or technical publication
Indian PIB press release (12 August 2026): installed data-centre capacity grew from 375 MW in 2020 to about 1,575 MW, and CEA estimates about 17 GW of data-centre demand up to 2031-32.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Infocomm Media Development Authority (IMDA), Singapore, 2024, Guide or technical publication
Singapore IMDA's 2024 roadmap sets a 10-year goal for all data centres to reach PUE ≤ 1.3 at 100% IT load and WUE ≤ 2.0 m3/MWh, alongside at least 300 MW of additional capacity.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
BEAM Society Limited, 2020, Guide or technical publication
The March 2020 BEAM Society guide from Hong Kong lists best practices across 11 sections covering the whole data-centre life cycle, each with qualitative effort and effectiveness ratings on a 1 to 5…
Guide or technical publication
2020
Read at publisher (opens in a new tab)↗
Malaysian Investment Development Authority, Year not stated, Guide or technical publication
Malaysia's MIDA guideline ties the DESAC tax incentive to declared design PUE, CUE and WUE: PUE of 1.4 or below for hyperscale, 1.6 to 1.7 or below for colocation, and WUE of 2.2 m3/MWh or lower.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
UK Department for Business, Innovation, Science and Trade, 2026, Guide or technical publication
The UK government's October 2026 initial NPS proposal: data centres of 100 MW or more rated IT load may be directed into the NSIP regime, and designs are expected to meet a PUE of 1.3 or better.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
İSKİD, 2021, Guide or technical publication
A 2021 ISKİD presentation by Toros Arslanyan: absorption chiller types (LiBr-water, ammonia-water) from cogeneration to trigeneration, with working principles and comparison of open and closed coolin…
Guide or technical publication
2021
Read at publisher (opens in a new tab)↗
Presidência da República / Senado Federal, Brazil, 2026, Guide or technical publication
Brazil's Law 15,504 of 15 September 2026 creates the Redata regime suspending PIS/Cofins, IPI and import duty on data-centre equipment, with conditions including WUE of at most 0.05 L/kWh.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Climate Neutral Data Centre Pact (CNDCP), 2025, Guide or technical publication
A 17-page 2025 paper from the Climate Neutral Data Centre Pact arguing that EU minimum performance standards for data centres are premature, and that a PUE floor should sit near 1.8-1.9.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Minister for Planning, State of Victoria, 2026, Guide or technical publication
The Victorian Minister for Planning's statement of 5 October 2026 sets assessment expectations for data centre permit applications lodged on or after 23 September 2026 and requires 150 m building…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
National Association of Counties, 2026, Guide or technical publication
The US National Association of Counties' February 2026 primer: a data centre permitting and oversight framework for county governments with 200-500 ft setbacks, 65/55 dB noise limits and approvals…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
NSW Government, 2026, Guide or technical publication
The NSW Government's August 2026 guidelines set data-centre application targets of dPUE ≤1.25 with dWUE ≤1.0 (or dPUE ≤1.3 with dWUE ≤0.44), diesel generator emission limits and a 25% grid-demand…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Ministerio de Ciencia, Tecnología, Conocimiento e Innovación, Chile, 2024, Guide or technical publication
Chile's National Data Centre Plan (PDATA) 2024-2030, from the Ministry of Science, sets eight measures for an industry at 198 MW installed: a permit guide, SEIA environmental criteria, clean producti…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Planning Institute of Australia, 2026, Guide or technical publication
The Planning Institute of Australia's 2026 guidance note ties data-centre scale to site suitability and assessment evidence, and suggests operating conditions for noise, generator tests, water use…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
PLANMalaysia, Ministry of Housing and Local Government, 2024, Guide or technical publication
PLANMalaysia's 2024 guideline links site hazards, utility consultation and planning submission routes for new sites and building conversions, calling for consultation with TNB and water authorities…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
International Telecommunication Union (ITU-T), 2025, Guide or technical publication
ITU-T Recommendation L.1308 (December 2025) advises new low-carbon data centres to target an annual PUE of 1.3 in cool and 1.4 in warm climates, with a 75% renewable energy factor.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
PUB, Singapore’s National Water Agency, 2025, Guide or technical publication
A December 2025 page from Singapore's national water agency PUB publishing a data-centre median water efficiency index of 2.1 m³/MWh, derived from mandatory large-user submissions.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Swiss Re Institute, 2026, Guide or technical publication
Swiss Re Institute's Sigma Insights 07/2026 looks at concentrated asset value in large AI data centres and the physical risks from natural hazards, cooling-water damage, power continuity and on-site…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Enterprise Singapore / Singapore Standards Council, 2026, Guide or technical publication
A 70-page national standard, launched 27 August 2026, setting requirements and recommendations for direct liquid cooling in tropical data centres: planning and design, deployment and management, main…
Guide or technical publication
2026
Paid, at publisher (opens in a new tab)↗
Türk Tesisat Mühendisleri Derneği, 2011, Guide or technical publication
Sema Çelebi's article in TTMD Journal 75 (September-October 2011) on closed-loop and cooling tower water treatment; per Table 3, a 0.9 mm scale layer raises chiller energy consumption by about 30%.
Guide or technical publication
2011
Read at publisher (opens in a new tab)↗
PUB, Singapore’s National Water Agency, 2017, Guide or technical publication
PUB Singapore's November 2017 technical guide on cooling tower water balance, cycles of concentration (COC) optimisation, water quality and alternative sources; Green Mark rewards COC of 7 or more.
Guide or technical publication
2017
Read at publisher (opens in a new tab)↗
Next10 / Santa Clara University, 2026, Guide or technical publication
A May 2026 Next10 and Santa Clara University report that maps California data centres against water scarcity and social vulnerability indices, with five case studies exposing a transparency gap.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
State of Victoria, Department of Jobs, Skills, Industry and Regions, 2026, Guide or technical publication
Victoria's 2026 action plan coordinates land, grid, water and local-benefit expectations for data centres: operational electricity should be offset by new renewable supply and storage, and water-inte…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.