Consulting-Specifying Engineer 2015
Driving data center PUE, efficiency
Include economizer control limits, part-load loss curves for each electrical stage and the redundancy topology as energy model inputs.
- Water-cooled IT still rejects roughly 10-30% of cabinet capacity to air; such cabinets typically house 50-80 kW.