Uptime Institute, 2026, Guide or technical publication
The fourth paper in Uptime Institute's AI in Practice series covers bringing new AI-facility technologies into commissioning and owner handover, with systematic quality assurance at handover as its…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Uptime Institute, Year not stated, Guide or technical publication
The fifth and final paper in Uptime Institute's AI in Practice series addresses how operating teams should be organised to run AI facilities safely and efficiently.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Uptime Institute, 2026, Guide or technical publication
The second paper in Uptime Institute's AI in Practice series covers technology selection, tender requirements and vendor evaluation, including RFP or bid-tender specifications.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
UK Government (GOV.UK), 2025, Guide or technical publication
UK government plan (13 January 2025) for AI adoption and infrastructure.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
ETMD, 2023, Guide or technical publication
An article by the Electrical Engineers Association (ETMD) dated 19 December 2023 that explains the responsibilities of the original manufacturer and the final manufacturer (assembler) under IEC 61439…
Guide or technical publication
2023
Read at publisher (opens in a new tab)↗
EirGrid and SONI, 2026, Guide or technical publication
EirGrid and SONI 10-year report: Ireland is outside its 3-hour LOLE reliability standard in 2026-2028, and data centre and new technology load rises from 959 MVA in 2024 to 1,870 MVA by 2035 in the…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Danish Energy Agency (Energistyrelsen), 2026, Guide or technical publication
Danish Energy Agency note (October 2026): data-centre electricity demand is projected from a maturity-weighted Energinet grid-connection pipeline and a European market-share model, cutting the long-t…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
U.S. Government Accountability Office (GAO), 2025, Guide or technical publication
A US Government Accountability Office technology assessment of 22 April 2025 reports that US data centres used about 4% of US electricity in 2022 and could reach about 6% by 2026.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Open Compute Project, 2020, Guide or technical publication
An OCP specification defining requirements and recommendations for establishing trust in server components through device identity and measured evidence. It covers the platform discovering which devi…
Guide or technical publication
2020
PDF
Open Compute Project Foundation, 2026, Guide or technical publication
OCP PG 25 v1.0.0 (July 2026) defines purity, impurity, corrosion and filtration limits for a ready-to-use 25-28% propylene glycol, silicate-free, dyed coolant for cold plate liquid cooling.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Building and Construction Authority / IMDA, 2024, Guide or technical publication
Singapore's BCA and IMDA GMDC:2024 beta requires energy modelling at 25%, 50%, 75% and 100% IT load for new facilities, twelve months of PUE data for existing ones, and permanent cooling measurement.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
BEAM Society Limited, 2021, Guide or technical publication
The BEAM Society's 2021 manual defines a voluntary green-building assessment for existing data centres in Hong Kong; operating PUE of 2.0 earns 1 credit, 1.6 earns 8, with 1 more bonus at 1.5 and 2…
Guide or technical publication
2021
Read at publisher (opens in a new tab)↗
BEAM Society Limited, 2021, Guide or technical publication
BEAM Society Limited's September 2021 green-building assessment manual for new Hong Kong data centres: energy carries 40% of the weighting, design PUE is scored from 1.77 to 1.52, and the prerequisit…
Guide or technical publication
2021
Read at publisher (opens in a new tab)↗
RVO / Certios B.V., Year not stated, Guide or technical publication
A 12 October 2020 LEAP report by Dr. D.H. Harryvan (Certios) for RVO surveys data-centre technologies at TRL 6 or higher that could join Dutch recognised measures lists (EML), including UPS efficienc…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Natural Resources Canada, 2024, Guide or technical publication
Natural Resources Canada's November 2024 guide separates the responsibilities of enterprise operators, colocation providers and colocation customers and adapts EU best practices to the Canadian marke…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
TMMOB Elektrik Mühendisleri Odası, 2026, Guide or technical publication
An article in EMO's Elektrik Muhendisligi issue 479 separates fixed-installation verification (TS HD 60364-6) from appliance testing (TS EN 50678, TS EN 50699), giving 1.0 MOhm (500 V DC) insulation…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Türk Tesisat Mühendisleri Derneği, 2009, Guide or technical publication
TTMD's March-April 2009 supplement translating VDI 6019 Part 1: a smoke removal sizing method built on fire curves (t-squared growth, intensity coefficients from 0.0029 to 0.188 kW/s2).
Guide or technical publication
2009
Read at publisher (opens in a new tab)↗
İSKİD / Birol Kılkış, 2021, Guide or technical publication
A 2021 İSKİD seminar presentation by Prof. Birol Kılkış that compares cogeneration and trigeneration cases by first- and second-law efficiency and proposes RUE and RUEX instead of PUE for data centre…
Guide or technical publication
2021
Read at publisher (opens in a new tab)↗
Uptime Institute, Year not stated, Guide or technical publication
An Uptime Institute report proposing work-capacity calculation methods for accelerated AI servers and storage; authored by Jay Dietrich, it does not replace legal reporting rules.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Cybersecurity and Infrastructure Security Agency (CISA), 2022, Guide or technical publication
A two-page joint CISA and DOE alert of 29 March 2022 reporting that threat actors accessed internet-connected UPS devices, often through unchanged default credentials, and giving concrete actions.
Guide or technical publication
2022
Read at publisher (opens in a new tab)↗
Climate Neutral Data Centre Pact (CNDCP), 2025, Guide or technical publication
The Pact's 2025 initiative sets PUE of 1.3 (cool) and 1.4 (warm climates) for new data centres above 50 kW, and matching electricity with 75% clean energy by end-2025 and 100% by 2030.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Climate Neutral Data Centre Pact (CNDCP), 2024, Guide or technical publication
The CNDCP's 2021 workshop proposal sets a location-dependent maximum WUE with WUEmax = K0 x K1 x K2 x K3; the target is 0.4 L/kWh for potable water, cool climate and high water stress.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Electrical and Mechanical Services Department, Hong Kong, 2025, Guide or technical publication
Hong Kong EMSD's 9-page energy audit code: at least 12 months of bill data, a five-step audit, EUI calculation, the CBSI definition for a data-centre portion and a 400 A three-phase exemption limit.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Electrical and Mechanical Services Department, Hong Kong, 2024, Guide or technical publication
The 88-page building energy code of the Hong Kong Electrical and Mechanical Services Department (EMSD); for data centre design the most relevant part is section 7: distribution losses, power quality…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.