Climate Neutral Data Centre Pact (CNDCP), 2026, Guide or technical publication
In April 2026 the Climate Neutral Data Centre Pact asked the Commission to build climate normalisation, aggregated scoring and a simple REF into the draft EU rating scheme so warm-region sites are…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Open Compute Project, 2020, Guide or technical publication
A November 2020 OCP Security workgroup document that treats firmware as the main asset, splits hardware and firmware threats into logical and physical-access attacks, and maps each to secure boot…
Guide or technical publication
2020
Read at publisher (opens in a new tab)↗
Open Compute Project Foundation, 2026, Guide or technical publication
Compares shipping cold-plate servers and racks wet, partially wet, semi-dry or dry in terms of expansion and corrosion risk and operational burden. It is used to plan shipment, storage and on-site…
Guide or technical publication
2026
PDF
American Water Works Association / Carollo Engineers, 2026, Guide or technical publication
A 2026 AWWA report with Carollo Engineers that gives water utilities criteria for judging each data-centre project on demand, supply reliability, financial exposure and public communication.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
American Water Works Association, 2025, Guide or technical publication
AWWA's October 2025 report on data-centre impacts on water utilities (demand, infrastructure, cost, energy, regulation) with an eight-point planning framework; direct consumption is projected from…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Servicio de Evaluación Ambiental, Chile, 2026, Guide or technical publication
Chile's Environmental Assessment Service (SEA) first-edition criterion of January 2026: SEIA entry for data centres is case by case, mainly through hazardous substances (80,000 kg) and secondarily…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Cybersecurity and Infrastructure Security Agency (CISA), 2025, Guide or technical publication
CISA's December 2025 CPG 2.0 revision aligns baseline cybersecurity goals for critical infrastructure to the six NIST CSF 2.0 functions, including GOVERN, and merges IT and OT goals into one set.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Monroe County Planning Commission, 2026, Guide or technical publication
The Monroe County Planning Commission guide in Pennsylvania recommends assessing utility plans, emergency service capability and environmental review processes before a proposal arrives.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Communications, Space and Technology Commission, Saudi Arabia, 2023, Guide or technical publication
Saudi registration guide distinguishes facilities under development from operating registration categories.
Guide or technical publication
2023
Read at publisher (opens in a new tab)↗
Congressional Research Service, 2025, Guide or technical publication
US Congressional Research Service report R48646 (26 August 2025): US data centres used about 176 TWh in 2023, 4.4% of US electricity, and could double or triple by 2028 to reach up to 12%.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Congressional Research Service, 2026, Guide or technical publication
A July 2026 Congressional Research Service report answering questions on data-centre water use, sources, discharges and the federal and state regulatory framework.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Virginia Joint Legislative Audit and Review Commission (JLARC), 2024, Guide or technical publication
The Virginia Joint Legislative Audit and Review Commission's Report 598 (December 2024) reviews the economic, utility and local impacts of Virginia data centres and presents policy options.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Department of Climate, Energy and the Environment, Ireland, 2025, Guide or technical publication
The Irish Department of Climate, Energy and the Environment guidance page says enterprise, colocation and co-hosting data centres with installed IT demand of at least 500 kW must report prior-year…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
IEA 4E EDNA, 2024, Guide or technical publication
Fiona Brocklehurst's November 2024 report for IEA 4E EDNA reviews 13 data-centre label and certification schemes and proposes a worldwide label that combines PUE with the Energy Reuse Factor (ERF).
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Swedish Energy Agency, Year not stated, Guide or technical publication
Swedish Energy Agency guidance: Act 2025:570, in force from 1 July 2025, requires data centres with at least 500 kW installed IT power demand to report annual data to an EU-wide database.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
NITI Aayog, Frontier Tech Hub, 2026, Guide or technical publication
NITI Frontier Tech Hub's October 2026 working paper: common criteria and minimum approval documents for Indian states to evaluate data centre proposals across five pillars (power, water, siting and…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
UK National Protective Security Authority, Year not stated, Guide or technical publication
UK National Protective Security Authority guidance for data-centre owners that connects perimeter controls with ducts, cable pits, meet-me rooms and building-management systems.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
IEA 4E EDNA, 2026, Guide or technical publication
IEA 4E EDNA platform report (June 2026): data-centre flexibility is assessed through three strategies (workload, supporting infrastructure, additional assets) across four data-centre types; workload…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Central Statistics Office (Ireland), 2025, Guide or technical publication
Ireland's Central Statistics Office reported on 10 June 2025 that metered electricity use by data centres rose 10% in 2024 to 6,969 GWh, reaching 22% of all metered consumption in the country.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Central Statistics Office, Ireland, 2026, Guide or technical publication
Ireland's Central Statistics Office: metered electricity consumption by data centres rose 10% in 2025 to 7,663 GWh, 23% of all metered consumption (5% in 2015).
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
UK Government (GOV.UK), 2024, Guide or technical publication
UK government announcement of 12 September 2024 designating data centres as Critical National Infrastructure, the first new CNI designation since 2015.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Japan Agency for Natural Resources and Energy (METI), 2026, Guide or technical publication
Japan Agency for Natural Resources and Energy (METI): the existing benchmark objective is PUE of 1.4 or less by FY2030, and new facilities established from FY2029 are expected to reach PUE of 1.3 or…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Energy Authority of Finland (Energiavirasto), Year not stated, Guide or technical publication
Guidance from the Energy Authority of Finland (Energiavirasto): data centres with at least 500 kW installed IT demand report by 15 May each year; those above 1 MW total power must use waste heat or…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Norwegian Communications Authority (Nkom), 2025, Guide or technical publication
Norway's Nkom guide explains registration, security management, exercise and incident notification duties for data centres above 0.5 MW subscribed power under the ekom act in force from 1 January…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.