Japan Data Center Council, Year not stated, Guide or technical publication
This Japan Data Center Council (JDCC) page separates its facility-level PUE guideline from operator-level benchmark reporting; the target level is set for fiscal year 2030.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
EnergieSchweiz, Bundesamt für Energie, Year not stated, Guide or technical publication
EnergieSchweiz planning guide for cantons and municipalities: Schaffhausen requires PUE+ of at most 1.20 within three years of commissioning, and up to 80% of a data centre's electricity could be…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Österreichische Energieagentur, Energieeffizienz-Monitoringstelle, 2025, Guide or technical publication
Describes the data centre reporting scope, the reporting platform and how it relates to European efficiency reporting and voluntary environmental schemes. Scope starts at 500 kW of installed IT elect…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Iowa Department of Natural Resources, Year not stated, Guide or technical publication
Iowa Department of Natural Resources web guide: there is no single data-centre permit; withdrawals of 25,000 gallons or more per 24 hours, air, stormwater, wastewater and floodplain each need their…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
National Information Technology Agency / Ghana Business Regulatory Reforms Portal, 2024, Guide or technical publication
Data-centre-specific consultation framework that combines registration evidence with technical design guidance. For two main distribution areas it calls for diverse cable routes, separate fire zones…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
IBPSA, 2025, Guide or technical publication
An IBPSA 2025 paper validates a 150 kW rear-door-heat-exchanger module by CFD at 24 °C supply air and finds an annual cooling PUE of 1.27 for a 30 MW facility.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Fingrid Oyj, 2026, Guide or technical publication
Fingrid's technical requirements for large demand facilities (for example large data centres) with a rated demand of at least 30 MW that connect directly to Finland's transmission system. The documen…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Central Bank of Nigeria, Year not stated, Guide or technical publication
The Central Bank of Nigeria's IT standards page sets a minimum Level 3 maturity for financial services and a Tier 3 data centre target (99.982% availability) based on TIA-942 and Uptime.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
UK Government, 2026, Guide or technical publication
The UK government's Data Centre Covenant: a target of 6 GW of AI data centre capacity by 2030, PUE of 1.3 or better for new facilities, and priority grid connection for strategic data centres.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
EEC Entegre Bina Kontrol Sistemleri, Year not stated, Guide or technical publication
An EEC case study of the Gayrettepe Turk Telekom internet data centre: an integrated Edwards and Xtralis (VESDA) system with aspirating smoke detection at three primary points and ceiling-level secon…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
USACE / NAVFAC / AFCEC, 2024, Guide or technical publication
The US Unified Facilities Guide Specification 01 91 00.15 (USACE, NAVFAC, AFCEC; May 2023, Change 3 August 2024) defines commissioning from design through warranty visit, with a Certificate of Readin…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
EEC Entegre Bina Kontrol Sistemleri, 2017, Guide or technical publication
An EEC blog post of 25 April 2017 summarising data centre physical security as fire detection (aspirating smoke detection), mantrap and biometric access control, CCTV analytics and unified security…
Guide or technical publication
2017
Read at publisher (opens in a new tab)↗
Abu Dhabi Department of Energy, 2022, Guide or technical publication
The Abu Dhabi Department of Energy policy (DoE/ED/G05/005), effective 1 September 2022, allows recycled, potable and sea water for district cooling towers and sets six objectives.
Guide or technical publication
2022
Read at publisher (opens in a new tab)↗
Agency for Natural Resources and Energy, METI, Year not stated, Guide or technical publication
The Japanese Agency for Natural Resources and Energy (METI) FAQ clarifies data-centre business types, tenant energy allocation and implementation details of efficiency reporting that are not yet dete…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Ministerio de Ciencia, Tecnología, Conocimiento e Innovación, Chile, 2025, Guide or technical publication
Chile's Ministry of Science guide (June 2025) lists energy feasibility, land use and permits for data-centre installation: environmental declaration (DIA) 12-18 months, building permit 6-8 months…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Publications Office of the European Union / Joint Research Centre, 2024, Guide or technical publication
The 2024 JRC proceedings collect nine papers from the March 2024 Frankfurt conference; the data-centre paper shows an edge data centre carrying a 20 A load while limiting grid draw to 16 A.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
TMMOB Makina Mühendisleri Odası, 2023, Guide or technical publication
Two papers from the TESKON 2023 proceedings: seismic restraint of mechanical services costs no more than 1% of mechanical cost and 0.3% of building cost; fire dampers must be tested to EN 1366-2 or…
Guide or technical publication
2023
Read at publisher (opens in a new tab)↗
North American Electric Reliability Corporation (NERC), 2026, Guide or technical publication
NERC's 2025 LTRA: 13 of 23 assessment areas face resource adequacy challenges over 10 years, summer peak demand is forecast to rise 224 GW, and data centres account for most of the growth.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Ministry of Industry and Information Technology, China, 2025, Guide or technical publication
Notice from China's Ministry of Industry and Information Technology and five other agencies (工信厅联节函〔2025〕279号): voluntary nomination requires at least one year of stable full-system operation and…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
British Geological Survey, 2026, Guide or technical publication
British Geological Survey 2026 seismic hazard maps give PGA and spectral acceleration for five return periods from 95 to 5000 years; at 475 years PGA is about 0.04 g across much of the offshore EEZ.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
International Renewable Energy Agency (IRENA), 2026, Guide or technical publication
IRENA's May 2026 report measures the cost of round-the-clock solar, wind and battery power with a firm LCOE: about USD 54-82/MWh in favourable regions in 2025, falling below USD 50/MWh by 2035.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Climate Neutral Data Centre Pact (CNDCP), 2025, Guide or technical publication
A 2025 discussion paper by Pact signatories argues that PUE, WUE and REF could be core metrics in an A-G style data-centre rating, ERF could not, and operators should only answer for what they contro…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
RAND, 2026, Guide or technical publication
RAND report RR-A5050-1 presents a quantitative model that ranks 31 candidate federal locations for a 1 GW data centre under four generation scenarios by energy infrastructure cost and readiness.
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Uptime Institute, Year not stated, Guide or technical publication
The third paper in Uptime Institute's AI in Practice series explains how to prevent design-to-build drift in AI facilities by monitoring critical construction milestones against specifications.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.