Nepal Ministry of Communication and Information Technology, 2025, Guide or technical publication
Nepal's Ministry of Communication and Information Technology directives, approved January 2025, require data-centre and cloud providers to register and set a minimum of Tier 3 for providers storing…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Rwanda Information Society Authority, Year not stated, Guide or technical publication
Rwanda Information Society Authority (RISA) guidelines cover data-centre design process, site selection, space planning, architectural and structural design, electrical systems and security; floor…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Tanzania e-Government Authority, 2026, Guide or technical publication
A February 2026 Tanzania e-Government Authority standard that classes public hosting as Tier II, III and IV: N+1 to 2N+1 redundancy, generator autonomy of 12, 72 and 96 hours, and availability of…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Susquehanna River Basin Commission, Year not stated, Guide or technical publication
A Susquehanna River Basin Commission (SRBC) page explaining approval routes for data-centre withdrawal and consumptive use; an ABR(e) approval is needed above 20,000 gallons per day (30-day average)…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
UK Government Office for Science, 2026, Guide or technical publication
UK Government Office for Science roundtable notes of 20 February 2026: siting depends on latency, data sensitivity, carbon and reliability; grid connection delay is the key constraint and water is…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
ICT Authority Kenya, 2023, Guide or technical publication
Kenya ICT Authority's third-edition government data centre standard (effective 1 July 2023) requires at least Tier 2 for public data, 1.2 m cold and 1.0 m hot aisles, and UPS batteries sized for at…
Guide or technical publication
2023
Read at publisher (opens in a new tab)↗
U.S. Department of Energy, ARPA-E, 2023, Guide or technical publication
The ARPA-E COOLERCHIPS operators' panel presents cooling design and operating lessons from LBNL NERSC (PUE 1.05), NREL ESIF (PUE 1.04 or below), NCAR NWSC (PUE 1.08) and ORNL.
Guide or technical publication
2023
Read at publisher (opens in a new tab)↗
GnCenergy, Year not stated, Guide or technical publication
GnCenergy's description of its Korean edge data centre: rear door heat exchangers (RDHx) for loads up to 80 kW, a 2160 kW air-cooled heat-pump chiller plant on 20/27 °C water, and 3500 kW of power…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
NSW Government, 2026, Guide or technical publication
NSW Government fact sheet (September 2026) explaining the data-centre requirement of at least 40% wind, 4-hour storage of at least 25% of generation capacity and agreements of at least 10 years, with…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
ICT Authority Kenya, 2025, Guide or technical publication
Kenya ICT Authority standard ICTA.2.2.004:2025 sets 1500 mm trench depth, maintenance-chamber and cable specifications, fibre attenuation limits, and acceptance testing with bidirectional OTDR and…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
ICT Authority Kenya, 2023, Guide or technical publication
Kenya ICT Authority standard ICTA.2.1.003:2023 sets telecommunication room sizes (at least 71 sq ft), a raised floor of at least 300 mm, structured-cabling limits, and commissioning and maintenance…
Guide or technical publication
2023
Read at publisher (opens in a new tab)↗
Agencia de Gobierno Electrónico y Sociedad de la Información y del Conocimiento (Agesic), Year not stated, Guide or technical publication
Agesic's MCU 5.0 guidance for Uruguay sets four maturity levels (13 controls) of physical access control for data centres, including no windows on outer walls, visitor logging with purpose, and an…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
U.S. Environmental Protection Agency, 2026, Guide or technical publication
US EPA's January 2026 guidance EPA-540-S-26-001: criteria for evaluating Superfund and Brownfield sites for data centres, including at least 100 acres for a 100 MW campus, 2-5% slope, flood zone and…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Direction générale des Entreprises, 2025, Guide or technical publication
France's DGE guide (November 2025) helps local authorities and project owners site data centres: grid connection takes 2-3 to 6-9 years, large projects average 50-250 MW, and operations create about…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Thailand Office of the Board of Investment, 2026, Guide or technical publication
The 2026 guide sets out eligibility conditions for high-efficiency data centre incentives: energy performance, service continuity and water planning. Activity 8.2.1.1 requires PUE not to exceed 1.3…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
ETMD, Elektrik Tesisat Mühendisleri Derneği, 2024, Guide or technical publication
A Teksan technical article in issue 114 of the ETMD magazine setting out layout rules for the generator room floor, arrangement, ventilation, fuel and exhaust, and listing common mistakes such as…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
PLANMalaysia Johor, 2024, Guide or technical publication
PLANMalaysia Johor's April 2024 guidelines split data centres into 1-5, 5-20 and 21-100 MW scales and set commercial-zone rules of at least 2 acres, 6 floors or 27 m height, 12 m setbacks and a 50 m…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Umweltbundesamt, 2025, Guide or technical publication
Germany's Federal Environment Agency (UBA) April 2025 guide builds on Blue Angel DE-UZ 228: for data centres commissioned after 2024 it recommends PUE ≤ 1.25 and CER > 9 as tender criteria.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
U.S. Department of Energy, FEMP, 2025, Guide or technical publication
A 2025 U.S. DOE FEMP addendum explaining how to measure and verify data-centre savings in performance-based energy contracts, adding nine data-centre-specific measures.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
National Information Technology Authority, Uganda, 2018, Guide or technical publication
Ugandan government cloud guidance covering information classification, hosting decisions, exceptions and service governance. Section 5.1 provides case-by-case NITA-U approval of offshore cloud except…
Guide or technical publication
2018
Read at publisher (opens in a new tab)↗
South Africa Department of Communications and Digital Technologies, 2024, Guide or technical publication
South African policy for data and cloud infrastructure, covering resource constraints, government hosting and continuity. The infrastructure section calls for backup water and electricity because of…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
New Zealand Government Communications Security Bureau, Year not stated, Guide or technical publication
The online manual of New Zealand's Government Communications Security Bureau includes controls for server-room access, cabinet security and labelling of equipment in data-centre environments.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah (LKPP), 2021, Guide or technical publication
Indonesia's Government Procurement Policy Agency (LKPP) issued Decision 193 of 26 October 2021, a data-centre operating guide targeting at least Tier-2, with 20% power headroom and at least 6 hours…
Guide or technical publication
2021
Read at publisher (opens in a new tab)↗
Department of Information and Communications Technology / Philippine Software Industry Association, 2024, Guide or technical publication
The 2024 framework from the Philippine DICT and PSIA defines data-centre facilities management as a competency running from level 2 to level 5, from routine maintenance to capacity planning.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗