White paperFree to read

Schneider Electric 2011

AC vs. DC Power Distribution for Data Centers

In the power-chain efficiency calculator multiply UPS, transformer/PDU, distribution and PSU efficiencies at the actual load fraction rather than nameplate, and offer architecture presets for the five options with Table 1 values as defaults.

  • The paper calls the North American 480 V AC system with PDU transformers inefficient and obsolete for new designs.
Research paperPDF

ITEGAM- Journal of Engineering and Technology for Industrial Applications (ITEGAM-JETIA) (GN1 Sistemas e Publicacoes Ltd.) 2021

Analysis of Power Quality Parameters at Comparing UPS of Different Technologies

Choose online double-conversion UPS for loads where power quality improvement is expected; an offline UPS passes harmonics and unbalance through to the load side.

  • Output power factor: offline UPS 0.95, online UPS 0.97 (PRODIST range 0.92-1.00).
Technical guideFree to read

Uptime Institute Journal (Uptime Institute) 2015

Arc Flash Mitigation in the Data Center

Include an arc flash incident-energy study placeholder and a labelling output for each switchboard in the electrical module.

  • Incident energy is measured in cal/cm2.
White paperFree to read

Siemens 2020

Arc-fault mitigation in unit substations (white paper)

In the arc-flash module, evaluate incident energy at the LV main line-side terminals using the upstream MV device's clearing time, not the LV main's.

  • MV primary fuse clearing: about 900 ms and 38.3 cal/cm2; LV main with 0.4 s short-time delay: 17.0 cal/cm2.
Research paperPDF

Standards (MDPI AG) 2026

Arc-Flash Hazards: Standards Development Framework in Facilities of National Importance in Healthcare and Data Centers

Schedule the arc-flash study after the coordination study and make that order a mandatory step in the project plan and model.

  • Example studies assumed available utility fault current of 21,000 A for the 440 V residential service and 21,000-40,000 A for the 480 V/1200 A commercial service.
Research paperPDF

Springer Science and Business Media LLC (preprint) 2026

Battery reserve autonomy and diesel generator mission reliability

When presenting UPS battery autonomy as a way to improve generator reliability, compute the reserve threshold against the mission duration and report that autonomy of minutes adds little to long-outage generator reliability.

  • For a 72 h mission with Fehr parameters: 0.95617 with one generator, 0.95847 with an ideal 4 h battery reserve, 0.99808 with two independent generators.
Research paperPDF

CIGRE US National Committee, 2025 Grid of the Future Symposium (arXiv preprint) 2025

Best Practices for Large Load Interconnections: A North American Perspective on Data Centers

In a large-load interconnection application, verify the relevant entity's large-load threshold (10-75 MW) and ramp limit (Southern ≤20 MW/min) early; definitions differ widely between entities.

  • Southern Company is the only entity in this review with a numeric ramp cap: ≤20 MW/min under normal operation.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.