BICSI 2026
BICSI Data Center Design Consultant (DCDC) certification
Add a 'credentials' field to the user profile and recognise DCDC as a value there.
- ANSI/BICSI 002-2024 is listed as a related resource.
Collection
Power distribution, UPS, batteries, protection and redundant supply.
49–72 / 418
BICSI 2026
Add a 'credentials' field to the user profile and recognise DCDC as a value there.
T.C. Cumhurbaşkanlığı Siber Güvenlik Başkanlığı 2026
Provide a Turkey public-sector compliance checklist mapping the measures to design objects: dedicated IT UPS, N+1 air conditioning with auto changeover, redundant feeds, generator fuel redundancy, room adjacency checks against wet areas.
T.C. Cumhurbaşkanlığı / Bakanlar Kurulu 2007
In the TR profile, default IT-room suppression to a TS ISO 14520 clean-agent design with damper-close interlocks.
Proceedings of the 28th ACM International Conference on Architectural Support for Programming Languages and Operating Systems, Volume 2 (ACM) 2023
Add an hourly 24/7 CFE coverage calculator to site and energy design that sizes wind, solar, BESS (in hours of IT load) and server headroom together; use hourly or sub-hourly supply profiles, never daily averages.
Vertiv 2025
Add a BESS block to the site model with power (MW), duration (h), reserved-backup fraction and grid/island capability.
Schneider Electric 2014
Capture peak kW/rack and the peak-to-average ratio as well as the average, and express density in W/rack instead of W/m2.
Open Compute Project Foundation 2026
Extend the generator catalogue with technology type (diesel, HVO, gas, H2 ICE, PEM fuel cell), emissions factor relative to the 1742 lb/MWh baseline, start time, block-load capability and NFPA 110 level.
European Commission 2022
When validating server PSU data against the 2023 tier, apply an informational exception, not a hard error, for units placed on the market during 2023 (legacy stock).
European Commission 2019
In the IT equipment catalogue store PSU efficiency at 10/20/50/100% load, power factor, active state efficiency (SERT/EN 303470) and declared operating class A1-A4, and validate new models against the 2023 tier.
Consulting-Specifying Engineer 2008
For phased builds, the tool should place load-bank connection points and isolation breakers and output a Cx test list with individual, discrete and integrated levels.
IEEE Open Journal of Industry Applications (Institute of Electrical and Electronics Engineers (IEEE)) 2020
Keep bus gap as an input in arc flash calculations for DC panels and battery busbars; do not rely on the maximum-power method alone.
CIGRE US National Committee, 2026 Grid of the Future Symposium (arXiv preprint) 2026
Design data-centre UPS and load control to the most restrictive entity's requirement: 6.0 s ride-through at 0.70-0.90 pu (CAISO), six fault-clearing attempts within 90 s (SPP), six 50-70 ms reclosings (Dominion), and the ban on constant-power control (SPP).
Schneider Electric 2021
Add a protectionControlScheme attribute to the MV module: hardwired_plc_modbus, iec61850_station_bus, iec61850_process_bus.
Schneider Electric 2011
Store UPS efficiency as a curve with at least 25/50/75/100% load points, plus storage type (battery, flywheel) and ride-through seconds.
Vertiv 2024
Record telemetry capability (protocols, factory sensors, remote monitoring support) in the equipment catalog.
Cummins 2017
Check smallest-to-largest set ratio against the 30% guideline and flag designs below it.
Schneider Electric 2017
Distinguish 'N+1 internal modular', 'N+1 parallel redundant' and 'isolated redundant' instead of a single N+1 flag; for modular frames store module rating, max modules, shared battery bus and redundant controls/fans.
Eaton 2025
Add grid-code parameters to the utility connection object: UFLS stages, LVRT curve, post-fault power recovery ramp (%/s) and short-circuit ratio at the PCC.
Consulting-Specifying Engineer 2018
In business-model templates (enterprise, colo, cloud), set default redundancy and base-to-redundant ratios.
Cummins 2025
Give generator catalogue entries a rating table keyed by class {ESP, PRP, COP, DCP, DCC/manufacturer-unlimited} rather than a single kW value.
Cushman & Wakefield 2026
In the cost module, offer an all-in $/MW benchmark band with source and year and allow a market multiplier.
Lawrence Berkeley National Laboratory, Center of Expertise for Energy Efficiency in Data Centers 2023
Benchmark the electrical loss model against this tool's structure: transformer, UPS and PDU efficiency curves by load factor, plus eco-mode.
Open Compute Project Foundation 2025
Rack catalogue entries should carry a distribution-voltage attribute (48 VDC, +/-400 VDC, AC); flag 48 V in-rack designs above roughly 150 kW per rack as needing a sidecar or higher-voltage DC architecture.
Open Compute Project Foundation 2026
Choose the voltage class with LV limited to 1500 VDC; check that sources stay below it in steady state (for example 750 V per pole) and that device voltage windows fit; 800 V devices with only a +/-5% range cannot operate below 750 V and are unusable there.
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.
Monthly newsletter · free
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.