RegulationFree to read

T.C. Cumhurbaşkanlığı Siber Güvenlik Başkanlığı 2026

Bilgi ve İletişim Güvenliği Rehberi - 3.6.2 Sistem Odası/Veri Merkezine Yönelik Güvenlik Tedbirleri (Information and Communication Security Guide - measures for system rooms/data centres)

Provide a Turkey public-sector compliance checklist mapping the measures to design objects: dedicated IT UPS, N+1 air conditioning with auto changeover, redundant feeds, generator fuel redundancy, room adjacency checks against wet areas.

  • Water, power, humidity, temperature and smoke must be monitored with thresholds and alarms; monitoring must not be exposed externally (3.6.2.5).
Research paperFree to read

Proceedings of the 28th ACM International Conference on Architectural Support for Programming Languages and Operating Systems, Volume 2 (ACM) 2023

Carbon Explorer: A Holistic Framework for Designing Carbon Aware Datacenters

Add an hourly 24/7 CFE coverage calculator to site and energy design that sizes wind, solar, BESS (in hours of IT load) and server headroom together; use hourly or sub-hourly supply profiles, never daily averages.

  • Grid lifecycle intensities (gCO2eq/kWh): wind 11, nuclear 12, hydro 24, solar 41, biofuels/other 230, natural gas 490, oil 650, coal 820.
Technical guidePDF

Open Compute Project Foundation 2026

Clean Backup Power Technology Requirements, Base Specification Version 0.3 (effective Apr 22, 2026)

Extend the generator catalogue with technology type (diesel, HVO, gas, H2 ICE, PEM fuel cell), emissions factor relative to the 1742 lb/MWh baseline, start time, block-load capability and NFPA 110 level.

  • Overload 110% for 60 s and 150% for 3 s; transient voltage response to ISO 8528-5 G3; steady-state frequency within +/-0.5%.
Technical guidePDF

European Commission 2022

Commission Notice on the application of ecodesign requirements on the efficiency of power-supply units in servers and data-storage products and on the power-source efficiency of welding equipment (2022/C 469/03)

When validating server PSU data against the 2023 tier, apply an informational exception, not a hard error, for units placed on the market during 2023 (legacy stock).

  • The Commission expects the problem to be short-term and largely resolved before 1 January 2024.
RegulationPDF

European Commission 2019

Commission Regulation (EU) 2019/424 of 15 March 2019 laying down ecodesign requirements for servers and data storage products - consolidated text 01.03.2021 (incl. Regulation (EU) 2021/341)

In the IT equipment catalogue store PSU efficiency at 10/20/50/100% load, power factor, active state efficiency (SERT/EN 303470) and declared operating class A1-A4, and validate new models against the 2023 tier.

  • Secure data deletion applies from 1 March 2020; latest firmware and security updates must be made available from 1 March 2021.
Technical guideFree to read

Consulting-Specifying Engineer 2008

Commissioning on-site electrical systems

For phased builds, the tool should place load-bank connection points and isolation breakers and output a Cx test list with individual, discrete and integrated levels.

  • The owner estimated a $5 million recovery cost had the load dropped.
Research paperPDF

CIGRE US National Committee, 2026 Grid of the Future Symposium (arXiv preprint) 2026

Comparative Analysis of Large Load Interconnection Requirements Across U.S. Transmission Entities

Design data-centre UPS and load control to the most restrictive entity's requirement: 6.0 s ride-through at 0.70-0.90 pu (CAISO), six fault-clearing attempts within 90 s (SPP), six 50-70 ms reclosings (Dominion), and the ban on constant-power control (SPP).

  • MISO's proposal requires withstanding three voltage disturbances within 10 s and phase-angle jumps up to 25 degrees.
White paperFree to read

Schneider Electric 2011

Comparison of Static and Rotary UPS

Store UPS efficiency as a curve with at least 25/50/75/100% load points, plus storage type (battery, flywheel) and ride-through seconds.

  • Rotary can cost 40% more up front and is typically not modular.
Technical guideFree to read

Eaton 2025

Data Center as a Good Grid Citizen

Add grid-code parameters to the utility connection object: UFLS stages, LVRT curve, post-fault power recovery ramp (%/s) and short-circuit ratio at the PCC.

  • Typical BESS Li-ion cells are limited to about 1C discharge.
Technical guideFree to read

Lawrence Berkeley National Laboratory, Center of Expertise for Energy Efficiency in Data Centers 2023

Data Center Electrical Power Chain Tool, v2.5 (July 2023)

Benchmark the electrical loss model against this tool's structure: transformer, UPS and PDU efficiency curves by load factor, plus eco-mode.

  • The July 2023 update added transmission and distribution (T&D) losses.
Technical guidePDF

Open Compute Project Foundation 2026

Data Center Facility - Low Voltage Direct Current Power Distribution, Version 1.1.0

Choose the voltage class with LV limited to 1500 VDC; check that sources stay below it in steady state (for example 750 V per pole) and that device voltage windows fit; 800 V devices with only a +/-5% range cannot operate below 750 V and are unusable there.

  • Moving backup energy storage out of the rack frees 12-16 OU, 27-36% more space in a 44 OU rack.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.