U.S. DOE Better Buildings / Lawrence Berkeley National Laboratory 2017
Data Center Metering and Resource Guide (February 2017)
At a stand-alone site, design meters that record energy (kWh) at the utility entrance and at the UPS output (or at panels serving only IT if there is no UPS); a UPS display that shows only power (kW) is not enough.
- PUE Level 1 for a stand-alone data center is utility meter reading divided by UPS output energy (M1/M2).