Collection

Recently added

Technical references added to the library in the last 90 days.

Sources
1044
Downloadable PDFs
270
Years
1984–2027

All sources

73–96 / 1044

Research paperPDF

ITEGAM- Journal of Engineering and Technology for Industrial Applications (ITEGAM-JETIA) (GN1 Sistemas e Publicacoes Ltd.) 2021

Analysis of Power Quality Parameters at Comparing UPS of Different Technologies

Choose online double-conversion UPS for loads where power quality improvement is expected; an offline UPS passes harmonics and unbalance through to the load side.

  • Output power factor: offline UPS 0.95, online UPS 0.97 (PRODIST range 0.92-1.00).
RegulationPDF

European Commission 2026

Annexes 1 to 3 to Commission Delegated Regulation C(2026) 3472 - EU data centre energy (PUE) and water (WUE) efficiency classes, data centre label, and amendments to Delegated Regulation (EU) 2024/1364

Translate PUE and WUE targets into A-G classes: class A needs a design PUE of 1.15 or below and WUE of 0.1 or below; the class D boundary is 1.5 and 0.6. Write the class target into the design specification.

  • WUE classes: A <= 0.1; B 0.1-0.2; C 0.2-0.4; D 0.4-0.6; E 0.6-0.8; F 0.8-1.0; G > 1.0.
Technical guideFree to read

Consulting-Specifying Engineer 2016

Applying NFPA 75 in data centers

Define the IT room default as 1-hour separation, 3/4-hour doors and fire and smoke dampers at penetrations.

  • Doors in the separation must be 3/4-hour rated.
Technical guideFree to read

Uptime Institute Journal (Uptime Institute) 2015

Arc Flash Mitigation in the Data Center

Include an arc flash incident-energy study placeholder and a labelling output for each switchboard in the electrical module.

  • Incident energy is measured in cal/cm2.
White paperFree to read

Siemens 2020

Arc-fault mitigation in unit substations (white paper)

In the arc-flash module, evaluate incident energy at the LV main line-side terminals using the upstream MV device's clearing time, not the LV main's.

  • MV primary fuse clearing: about 900 ms and 38.3 cal/cm2; LV main with 0.4 s short-time delay: 17.0 cal/cm2.
Research paperPDF

Standards (MDPI AG) 2026

Arc-Flash Hazards: Standards Development Framework in Facilities of National Importance in Healthcare and Data Centers

Schedule the arc-flash study after the coordination study and make that order a mandatory step in the project plan and model.

  • Example studies assumed available utility fault current of 21,000 A for the 440 V residential service and 21,000-40,000 A for the 480 V/1200 A commercial service.
Research paperPDF

arXiv preprint (cs.AI), Harvard T.H. Chan School of Public Health 2026

Assessing the Carbon Emissions and Energy Consumption of U.S. Hyperscale Data Centers

In fleet or facility energy estimation, use capacity × 8,760 × facility-load coefficient (0.48-0.70, central 0.58) and report the range (67.7-98.6 TWh) explicitly.

  • State-level intensities (central scenario): Virginia 535, Oregon 440, Iowa 645, Nebraska 740, Wyoming 1035 gCO2/kWh; Virginia had 142 HDCs, 21.0 TWh, 11.5 Mt.
Technical guidePDF

European Commission, DG ENER (AIT, Borderstep Institute, EY) 2025

Assessment of next steps to promote the energy performance and sustainability of data centres in EU, including the establishment of an EU-wide rating scheme - Second technical report

Align the PUE target of new designs with the proposed MPS: design PUE below 1.3 and operational PUE below 1.4 in the first three years; for existing sites plan the path to below 1.5 by 2030.

  • MPS feasibility was tested across 27 data centre archetypes with selected best available techniques (BAT).

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.