Agency for Natural Resources and Energy, METI, Year not stated, Guide or technical publication
The Japanese Agency for Natural Resources and Energy (METI) FAQ clarifies data-centre business types, tenant energy allocation and implementation details of efficiency reporting that are not yet dete…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Ministry of Industry and Information Technology, China, 2025, Guide or technical publication
Notice from China's Ministry of Industry and Information Technology and five other agencies (工信厅联节函〔2025〕279号): voluntary nomination requires at least one year of stable full-system operation and…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Climate Neutral Data Centre Pact (CNDCP), 2025, Guide or technical publication
A 2025 discussion paper by Pact signatories argues that PUE, WUE and REF could be core metrics in an A-G style data-centre rating, ERF could not, and operators should only answer for what they contro…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Danish Energy Agency (Energistyrelsen), 2026, Guide or technical publication
Danish Energy Agency note (October 2026): data-centre electricity demand is projected from a maturity-weighted Energinet grid-connection pipeline and a European market-share model, cutting the long-t…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Building and Construction Authority / IMDA, 2024, Guide or technical publication
Singapore's BCA and IMDA GMDC:2024 beta requires energy modelling at 25%, 50%, 75% and 100% IT load for new facilities, twelve months of PUE data for existing ones, and permanent cooling measurement.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
BEAM Society Limited, 2021, Guide or technical publication
The BEAM Society's 2021 manual defines a voluntary green-building assessment for existing data centres in Hong Kong; operating PUE of 2.0 earns 1 credit, 1.6 earns 8, with 1 more bonus at 1.5 and 2…
Guide or technical publication
2021
Read at publisher (opens in a new tab)↗
Natural Resources Canada, 2024, Guide or technical publication
Natural Resources Canada's November 2024 guide separates the responsibilities of enterprise operators, colocation providers and colocation customers and adapts EU best practices to the Canadian marke…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
İSKİD / Birol Kılkış, 2021, Guide or technical publication
A 2021 İSKİD seminar presentation by Prof. Birol Kılkış that compares cogeneration and trigeneration cases by first- and second-law efficiency and proposes RUE and RUEX instead of PUE for data centre…
Guide or technical publication
2021
Read at publisher (opens in a new tab)↗
Uptime Institute, Year not stated, Guide or technical publication
An Uptime Institute report proposing work-capacity calculation methods for accelerated AI servers and storage; authored by Jay Dietrich, it does not replace legal reporting rules.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Climate Neutral Data Centre Pact (CNDCP), 2025, Guide or technical publication
The Pact's 2025 initiative sets PUE of 1.3 (cool) and 1.4 (warm climates) for new data centres above 50 kW, and matching electricity with 75% clean energy by end-2025 and 100% by 2030.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Climate Neutral Data Centre Pact (CNDCP), 2024, Guide or technical publication
The CNDCP's 2021 workshop proposal sets a location-dependent maximum WUE with WUEmax = K0 x K1 x K2 x K3; the target is 0.4 L/kWh for potable water, cool climate and high water stress.
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Electrical and Mechanical Services Department, Hong Kong, 2025, Guide or technical publication
Hong Kong EMSD's 9-page energy audit code: at least 12 months of bill data, a five-step audit, EUI calculation, the CBSI definition for a data-centre portion and a 400 A three-phase exemption limit.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Electrical and Mechanical Services Department, Hong Kong, 2024, Guide or technical publication
The 88-page building energy code of the Hong Kong Electrical and Mechanical Services Department (EMSD); for data centre design the most relevant part is section 7: distribution losses, power quality…
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Climate Neutral Data Centre Pact (CNDCP), 2026, Guide or technical publication
In April 2026 the Climate Neutral Data Centre Pact asked the Commission to build climate normalisation, aggregated scoring and a simple REF into the draft EU rating scheme so warm-region sites are…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Department of Climate, Energy and the Environment, Ireland, 2025, Guide or technical publication
The Irish Department of Climate, Energy and the Environment guidance page says enterprise, colocation and co-hosting data centres with installed IT demand of at least 500 kW must report prior-year…
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
IEA 4E EDNA, 2024, Guide or technical publication
Fiona Brocklehurst's November 2024 report for IEA 4E EDNA reviews 13 data-centre label and certification schemes and proposes a worldwide label that combines PUE with the Energy Reuse Factor (ERF).
Guide or technical publication
2024
Read at publisher (opens in a new tab)↗
Swedish Energy Agency, Year not stated, Guide or technical publication
Swedish Energy Agency guidance: Act 2025:570, in force from 1 July 2025, requires data centres with at least 500 kW installed IT power demand to report annual data to an EU-wide database.
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Central Statistics Office (Ireland), 2025, Guide or technical publication
Ireland's Central Statistics Office reported on 10 June 2025 that metered electricity use by data centres rose 10% in 2024 to 6,969 GWh, reaching 22% of all metered consumption in the country.
Guide or technical publication
2025
Read at publisher (opens in a new tab)↗
Central Statistics Office, Ireland, 2026, Guide or technical publication
Ireland's Central Statistics Office: metered electricity consumption by data centres rose 10% in 2025 to 7,663 GWh, 23% of all metered consumption (5% in 2015).
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Japan Agency for Natural Resources and Energy (METI), 2026, Guide or technical publication
Japan Agency for Natural Resources and Energy (METI): the existing benchmark objective is PUE of 1.4 or less by FY2030, and new facilities established from FY2029 are expected to reach PUE of 1.3 or…
Guide or technical publication
2026
Read at publisher (opens in a new tab)↗
Energy Authority of Finland (Energiavirasto), Year not stated, Guide or technical publication
Guidance from the Energy Authority of Finland (Energiavirasto): data centres with at least 500 kW installed IT demand report by 15 May each year; those above 1 MW total power must use waste heat or…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
Swedish Energy Agency (Energimyndigheten), 2023, Guide or technical publication
RISE's January 2023 report for the Swedish Energy Agency estimates Swedish data-centre electricity use at 2.8-3.2 TWh in 2022, 4.0-4.4 TWh in 2025 and 4.4-5.2 TWh in 2030.
Guide or technical publication
2023
Read at publisher (opens in a new tab)↗
Bundesamt fuer Justiz (gesetze-im-internet.de), 2023, Guide or technical publication
Germany's Energy Efficiency Act of 13 November 2023 contains the most prescriptive national data centre rules in Europe: dated PUE limits, a minimum share of reused energy for new sites, renewable…
Guide or technical publication
2023
Read at publisher (opens in a new tab)↗
Federal Office for Energy Efficiency (BfEE / BAFA), Year not stated, Guide or technical publication
Under Section 13 of Germany's EnEfG, data-centre operators with at least 300 kW non-redundant nominal connected load report the previous calendar year's data to the federal register and publish it…
Guide or technical publication
-
Read at publisher (opens in a new tab)↗
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.