Collection

Power and UPS

Power distribution, UPS, batteries, protection and redundant supply.

Sources
418
Downloadable PDFs
95
Years
1984–2027

All sources

241–264 / 418

White paperFree to read

Schneider Electric 2024

Recycling and Circularity of Li-Ion Batteries

Add chemistry (LFP/NMC/NCA), module construction (bolted or welded), battery passport availability, take-back/EPR programme and declared recycled content to the battery catalog.

  • Li-ion batteries are UN Class 9 dangerous goods.
Research paperFree to read

Proceedings of the 2018 3rd Joint International Information Technology,Mechanical and Electronic Engineering Conference (JIMEC 2018) (Atlantis Press) 2018

Research on Availability of Data Center UPS Power Supply System

Offer 'UPS + utility (mains) dual bus' as a topology template beside 2N and N+1, with an RBD calculation that shows it can match 2N for dual-corded IT load.

  • Power-system failures are cited as 72.2% of data-centre failures.
Research paperPDF

World Electric Vehicle Journal (MDPI AG) 2023

Research on Calendar Aging for Lithium-Ion Batteries Used in Uninterruptible Power Supply System Based on Particle Filtering

Plan UPS battery replacement from the RUL of the weakest cell rather than the string average; in a series string one cell sets the replacement date for the whole string even when others have years of life left.

  • Per-cell SOH estimation RMSE ranged from 0.15% to 9.07% (MAPE 0.16% to 6.85%).
Research paperPDF

IEEE Access (Institute of Electrical and Electronics Engineers (IEEE)) 2026

Review of the 800-VDC Power Delivery Architecture and Isolated 800-V to 48-V Converter Solutions for Future AI Data Centers

Define 800 VDC unipolar, ±400 VDC bipolar and 48/54 VDC busbar as separate voltage classes in the single-line diagram, each with its own conductor ampacity, breaker pole count and clearance (IEC 60664-1) checks.

  • The OCP Open Rack V3 PSU specification targets above 97.5% peak efficiency and at least 96.5% across 30%-100% load.
Technical guideFree to read

Eaton 2008

Selective Coordination (Cooper Bussmann Electrical Protection Handbook section)

In the coordination checker store device type (fuse class, breaker with or without instantaneous, STD band) and use ratio tables or tested pair tables rather than curves when fault current puts both devices below 0.01 s.

  • Fuse selectivity: load-side total clearing I2t below line-side melting I2t; Low-Peak families need 2:1 amp ratio, other combinations up to 8:1.
Research paperPDF

arXiv (Texas Tech University) 2021

Short Circuit and Arc Flash Study on a Microgrid Facility

In a data-centre LV system with generator backup, run the arc-flash study for both grid-connected and islanded topologies, and check that the much lower islanded fault current (1,296 A instead of 22,793 A) does not lengthen clearing time.

  • A factor of 1.4 was applied to the datasheet maximum short-circuit current of inverter-based sources as a safety band.
Research paperPDF

Fire (MDPI AG) 2023

Simulation Test on Cooling and Fire Suppression with Liquid Nitrogen in Computer Room of Data Center

When assessing non-gas, non-water suppression options, note liquid nitrogen only as a preliminary-stage option, and ask for full-scale testing and an occupant-safety analysis for oxygen depletion before taking design values.

  • Liquid nitrogen extinguished the optical-fibre fire within 3 min and the UPS-component fire within 2 min.
White paperFree to read

Schneider Electric 2019

Solving Edge Computing Infrastructure Challenges

Provide an edge/micro data centre template: single-rack bundle of rack, UPS, rack PDU, cooling (passive default), sensors and cameras.

  • Prefabricated modules save about 50% of design and engineering time (WP 163).
Technical guideFree to read

ABB Year not stated

Standard requirements for selectivity

In a selectivity study, present curve overlap and current-ratio checks only as screening tools.

  • The distinction is discussed in the context of IEC/TR 61912-2 and IEC 60947-2 Annex A.
Research paperPDF

IEEE Open Journal of Power Electronics (Institute of Electrical and Electronics Engineers (IEEE)) 2026

State-of-the-Art Power Electronics in AI Data Centers

In rack power templates, model PSU count per shelf and the 33 kW shelf limit for AC distribution, and check busbar, PDU and cooling impact together for racks that exceed 100 kW with several shelves.

  • AI rack density is 30-100+ kW against 7-10 kW for traditional racks; an 8-GPU DGX H100 draws around 10,200 W.
Research paperFree to read

Revista de Informática Teórica e Aplicada (Universidade Federal do Rio Grande do Sul) 2019

Stochastic Models for Optimizing Availability, Cost and Sustainability of Data Center Power Architectures through Genetic Algorithm

Recognise that topology choice is only part of availability; equipment selection within a fixed topology can trade availability, losses and cost.

  • Tier I: cost 122,322.20 to 116,004.52 USD (5.16%), exergy 203.39 to 140.13 J (31.10%), availability 3.3643 to 3.4005 nines.
Research paperPDF

Sustainability (MDPI AG) 2021

Strategies for Improving the Sustainability of Data Centers via Energy Mix, Energy Conservation, and Circular Energy

Calculate UPS load ratio (80% for 800 kW in a modular arrangement, 53% in parallel-redundant) and losses at design stage; consider specifying UPS efficiency at 30% load and compare a SiC-based power stage (above 98%).

  • CUE is defined as total CO2 emissions over ICT energy, or equivalently the CO2 emission factor × PUE.
Research paperPDF

IEEE Open Journal of Industry Applications (Institute of Electrical and Electronics Engineers (IEEE)) 2025

Study of DC Arc Flash Phenomenon From 1000 V Lithium Ion Battery Systems

In arc flash estimation for high-voltage battery rooms, do not use the maximum-power method alone with an enclosure multiplier; cross-check unrealistic results with measurement-based models such as Ammerman's.

  • 91 arc-flash experiments were performed on LFP and LTO lithium-ion battery sources at voltages up to roughly 1000 VDC.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.