ASHRAE 2016
IT Equipment Design Impact on Data Center Solutions (ASHRAE Datacom Series Book 13)
Link IT equipment airflow and thermal characteristics in the catalog to facility cooling selection.
- Datacom Series Book 13, product code 90462.
The engineer’s reference desk
433–456 / 1,044 sources
ASHRAE 2016
Link IT equipment airflow and thermal characteristics in the catalog to facility cooling selection.
Lawrence Berkeley National Laboratory, Center of Expertise for Energy Efficiency in Data Centers 2023
In IT-refresh scenarios, propagate savings through cooling losses, power losses and water (WUE), as the DOE tool suite does.
Uptime Institute Journal 2026
Catalogue DLC loops with coolant type (PG25/DI), filtration rating (default 25 micron) and wetted materials.
Türk Tesisat Mühendisleri Derneği (TTMD) - TTMD Dergisi 2025
Use this case as a reference point for air-cooled, outside-air-assisted designs (PUE 1.2; MLC 0.117 in zone 3A).
Proceedings of the 7th ACM International Conference on Systems for Energy-Efficient Buildings, Cities, and Transportation (ACM) 2020
Include a calibration workflow in the hand-over to operations: import aisle sensor data, mark per-server airflow (and bypass/recirculation) as calibration parameters with priors, and report MAE before and after calibration.
STULZ 2024
Model the per-rack heat split (liquid %/air %); it drives both CDU and CRAH sizing.
Monthly newsletter · free
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
International Energy Agency 2026
For on-site generation sizing, when users choose islanded or behind-the-meter gas, apply an N+x overbuild check (30-70% above load per IEA) and model BESS for AI power swings.
Kişisel Verileri Koruma Kurumu (KVKK) 2025
When the 'personal data hosted' flag is set, require locked server rooms with access logging, fire and flood protection and segregated backup storage rooms in the layout checklist.
Kişisel Verileri Koruma Kurumu (KVKK) 2017
Implement scheduled purge or anonymisation jobs with a configurable interval not exceeding six months, including backups.
Kişisel Verileri Koruma Kurumu (KVKK) 2025
Treat any foreign-located support engineer's remote session into a Turkish customer's SoSo CAD instance or DCIM as a transfer and gate it behind a standard-contract check.
Kişisel Verileri Koruma Kurumu (KVKK) 2024
If SoSo CAD uses foreign sub-processors (cloud, email, monitoring), maintain an unmodified KVKK standard contract for each transfer path.
Consulting-Specifying Engineer 2024
Generator catalogue entries need kW/kVA at 0.8 PF plus derating inputs; the tool should auto-derate for site altitude and design ambient.
Consulting-Specifying Engineer 2026
Seed facility-type templates with default UPS/generator redundancy and fuel autonomy from Table 1.
TMMOB Makina Mühendisleri Odası (MMO) 2009
Use the paper's mode thresholds (approach of about 2 C for partial and about 5 C for full free cooling) as defaults in a free-cooling-hours estimator, fed by city bin data for Turkish sites.
Uptime Institute Journal (Uptime Institute) 2021
Separate UPS and battery rooms with fire-rated barriers.
Proceedings of the 22nd International Middleware Conference (ACM) 2021
For carbon and sustainability reporting, use hourly (not annual average) grid carbon-intensity profiles per region.
Legrand 2026
In the rack-power calculator, offer inlet presets (voltage, amps, plug), apply 80 % continuous derating and show kW per feed.
STULZ 2025
Define rack templates per GPU generation with a default kW and liquid/air split, for example 85/15 at 130 kW and 100/0 at 600 kW.
STULZ 2025
In the CDU selection tool let users trade approach temperature against heat-exchanger area and TCS delta-T, with Cases 1-3 as validation fixtures.
Energy Efficient HPC Working Group 2013
In commissioning checklists the tool generates for liquid-cooled plants, include verification that instrumentation matches manufacturer specifications.
ASHRAE 2013
In the DLC data model, keep facility water (FWS) and technology cooling system (TCS) loops separate, with a CDU as the interface.
WSP 2026
For TCS loops, add coolant fields (demineralised water, PG percentage).
Open Compute Project Foundation 2021
Add mechanical, hydraulic, electrical and network inspection protocols and a recorded pressure-decay test to the delivery and commissioning plan for rack acceptance.
Data Center Knowledge 2026
Add a retrofit check comparing liquid-cooled rack weight (default up to about 3,000 lb / 1,360 kg) with the raised-floor rating.