International Energy Agency 2026
Powering Artificial Intelligence: Strategies for Integrating Data Centres into Electricity Systems
In the grid-connection module, support firm and non-firm (curtailable, phased, dynamic-limit) options and size the BESS or genset capacity needed to ride through curtailment hours.
- Operators signed 45 TWh of PPAs in H1 2026 (up nearly 20%), about 70% in the United States.