U.S. General Services Administration (Public Buildings Service) 2020
GSA Commissioning Guide (September 2020)
Set up the commissioning plan at the start of a data center project: review the OPR and basis of design with the CxP and write measurable performance targets.
- At 10 months into a 12-month warranty period the CxP, operations office and CMa review systems for warranty repairs.