Topic guide

Operations

Explore publications on data centre operations, maintenance, monitoring and routine technical processes. Review operational guidance in the context of your facility’s equipment, responsibilities and procedures.

Sources
232
Downloadable PDFs
47
Years
2002–2027

All sources

169–192 / 232

White paperPDF

Open Compute Project Foundation 2022

White Paper: OCP Ready Data Centers - Program Mission, Methodology, and Case Studies, Revision 1.0 (June 2022)

Offer an 'OCP Ready' compliance profile that checks the delivery path (dock, ramps, door heights), floor load classes (uniform, concentrated, rolling), 3-phase IEC/NEMA rack circuits, hot/cold-aisle containment and generator load-acceptance time relative to BBU autonomy.

  • Design PUE ranges from 1.07 (Hydro66, WUE 0.059 L/kWh) to 1.6 (maincubes AMS01).
White paperFree to read

Rittal 2014

Whitepaper Rittal PDU international

Keep PDU catalogue fields for phases, input A, max kW, outlet types, ambient rating, metering accuracy, relay type and management protocol (SNMPv3).

  • C14 inlets carry up to 10 A; C20 up to 16 A for large consumers.
Research paperFree to read

IEEE Transactions on Sustainable Computing (Institute of Electrical and Electronics Engineers (IEEE)) 2025

xPUE: Extending Power Usage Effectiveness Metrics for Cloud Infrastructures

Do not present facility PUE as the whole efficiency story: add an optional server-overhead factor (sPUE) to the energy model and show an 'effective PUE' = PUE x sPUE next to PUE.

  • Idle servers gave sPUE > 4; on a Dell R640 under rising CPU load the average sPUE was 3.1 and the lowest 2.7.
RegulationPDF

European Commission (Official Journal of the European Union) 2024

Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres

Build the metering architecture to the regulation: meters on every supply input for total energy (grid and back-up generator separately) and at every UPS output for IT energy, with a system that retains measurement point and device records for at least 10 years.

  • Data centre electricity demand is projected to reach 3.2% of total EU demand by 2030, a 28% increase over 2018.
Research paperCitation

IEEE (Energy Efficient HPC Working Group paper; hosted by Lawrence Berkeley National Laboratory) 2021

Cooling the Data Center: Design of a Mechanical Controls Owner Project Requirements (OPR) Template

Use the eight-section outline as the skeleton for the controls part of an Owner's Project Requirements before the Basis of Design starts.

  • HPC system refresh cycles can be about 3 years, so mechanical cooling upgrades may follow a similar cycle.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.