White paperFree to read

Schneider Electric 2013

Calculating Space and Power Density Requirements for Data Centers

Use this paper as the template for the Design Basis form: target average kW per rack, peak kW per rack (default 2x average), density uncertainty (default 15%), managed power ratio (default 0.7) and reserve space (default 15%).

  • Example overall target density: 5 kW per cabinet, about 160 W/ft2 (1,722 W/m2).
White paperFree to read

Schneider Electric 2011

Calculating Total Power Requirements for Data Centers

Use it as a quick-sizing calculator in novice mode: take IT kW, future kW, floor area, cooling type and UPS input type, and output service kW/A and generator kW, with the multipliers as editable defaults.

  • Actual IT power is roughly nameplate VA x 0.67.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

Technical guidePDF

Open Compute Project Foundation 2023

Cold Plate Cooling Loop Requirements, Rev 2

Require each vendor to fill in the parameters of importance tables for cold plates, hoses, quick disconnects, loops, manifolds and CDUs so offers can be compared.

  • Glycol at 25% or above prevents bacterial growth; dielectric fluids are insulating but cost more and have higher GWP.
RegulationPDF

European Commission (Official Journal of the European Union) 2024

Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres

Build the metering architecture to the regulation: meters on every supply input for total energy (grid and back-up generator separately) and at every UPS output for IT energy, with a system that retains measurement point and device records for at least 10 years.

  • Data centre electricity demand is projected to reach 3.2% of total EU demand by 2030, a 28% increase over 2018.
White paperFree to read

Schneider Electric 2016

Comparing UPS System Design Configurations

Offer N, isolated redundant, N+1, distributed redundant (catcher/STS), tri-redundant, 2N and 2(N+1) in the topology library, and label availability values as comparative rather than absolute.

  • N+1 module loading for a 240 kW load: 2x240 kW 50%; 3x120 66%; 4x80 75%; 5x60 80%.
Research paperCitation

IEEE (Energy Efficient HPC Working Group paper; hosted by Lawrence Berkeley National Laboratory) 2021

Cooling the Data Center: Design of a Mechanical Controls Owner Project Requirements (OPR) Template

Use the eight-section outline as the skeleton for the controls part of an Owner's Project Requirements before the Basis of Design starts.

  • HPC system refresh cycles can be about 3 years, so mechanical cooling upgrades may follow a similar cycle.
Technical guidePDF

Open Compute Project Foundation 2026

Interface Specification Between Hyperscalers and Utility Grid for Disturbance Performance (Version 1.0.0)

For a new site, write the POI LVRT/HVRT envelope and the PFAPR requirement (90% within 2 s) as design criteria, and settle which voltage measurement (line-to-neutral or line-to-line) governs during protection coordination with the utility.

  • In ERCOT NOGRR 282, cooling load is subtracted from the pre-fault load used to judge PFAPR.
White paperPDF

Open Compute Project Foundation 2024

Data Center Facility Sustainability Metrics (OCP Data Center Facility white paper, October 2, 2024)

Build the metering plan so that PUE can be reported at the highest category possible, with IT load measured at PDU or equipment input rather than the UPS output where feasible.

  • External reporting is annual (required) and quarterly on a trailing 12 months (recommended); internal tracking should be continuous or monthly.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.