Metering rule: if projected PUE is below 1.2 require IT-level (PUE3) metering; at 1.2-1.5 require at least PDU-output (PUE2); otherwise UPS-output (PUE1) is acceptable.
Launched as a pilot in November 2019; replaces BREEAM Data Centres 2010.
Add an efficiency-degradation factor to the opex model for run-to-fail operation (+19%/+29%/+39%/+51% cooling energy in years 2 to 5) against the maintained case.
Average truck roll costs about $1,000 per dispatch.
Use this paper as the template for the Design Basis form: target average kW per rack, peak kW per rack (default 2x average), density uncertainty (default 15%), managed power ratio (default 0.7) and reserve space (default 15%).
Example overall target density: 5 kW per cabinet, about 160 W/ft2 (1,722 W/m2).
Use it as a quick-sizing calculator in novice mode: take IT kW, future kW, floor area, cooling type and UPS input type, and output service kW/A and generator kW, with the multipliers as editable defaults.
Require each vendor to fill in the parameters of importance tables for cold plates, hoses, quick disconnects, loops, manifolds and CDUs so offers can be compared.
Glycol at 25% or above prevents bacterial growth; dielectric fluids are insulating but cost more and have higher GWP.
Check the delivery route against rack height plus 0.5 m, door and corridor widths, and the lift capacity, before agreeing to host or design for Open Racks.
Maximum rack density is at least 8 kW (Acceptable) or 12 kW (Optimum); cold aisle width is at least 1,200 mm or 1,500 mm.
Build the metering architecture to the regulation: meters on every supply input for total energy (grid and back-up generator separately) and at every UPS output for IT energy, with a system that retains measurement point and device records for at least 10 years.
Data centre electricity demand is projected to reach 3.2% of total EU demand by 2030, a 28% increase over 2018.
Offer N, isolated redundant, N+1, distributed redundant (catcher/STS), tri-redundant, 2N and 2(N+1) in the topology library, and label availability values as comparative rather than absolute.
N+1 module loading for a 240 kW load: 2x240 kW 50%; 3x120 66%; 4x80 75%; 5x60 80%.
Add a dielectric-fluid catalog with family (hydrocarbon, fluorocarbon), phase (1p, 2p), flash point, boiling point, GWP, PFAS status, cost per litre and annual loss percentage.
Sealed two-phase systems can lose about 1 to 2% of fluid (evaporation) per year.
For a small data center or server room, write metering, air management and monitoring requirements into the specification from the start, given that energy management in this class tends to be poor.
Data center energy use is projected to grow 13% to 27% per year (CAGR) from 2023 through 2028.
Borrow the metric set (PUE, intake temperature and humidity, RTI, cooling efficiency, airflow efficiency, distribution efficiency) as the minimum list of measurements a monitoring design must support.
The wireless gateway (120 V house power) must have at least 72 hours of battery backup.
For a new site, write the POI LVRT/HVRT envelope and the PFAPR requirement (90% within 2 s) as design criteria, and settle which voltage measurement (line-to-neutral or line-to-line) governs during protection coordination with the utility.
In ERCOT NOGRR 282, cooling load is subtracted from the pre-fault load used to judge PFAPR.
Build the metering plan so that PUE can be reported at the highest category possible, with IT load measured at PDU or equipment input rather than the UPS output where feasible.
External reporting is annual (required) and quarterly on a trailing 12 months (recommended); internal tracking should be continuous or monthly.