Open Compute Project Foundation 2021
Liquid Cooling Integration and Logistics White Paper, Revision 1.0
Add mechanical, hydraulic, electrical and network inspection protocols and a recorded pressure-decay test to the delivery and commissioning plan for rack acceptance.
- Coolant shipped inside L10/L11 systems should be chosen to avoid freezing during transport.