Topic guide

Operations

Explore publications on data centre operations, maintenance, monitoring and routine technical processes. Review operational guidance in the context of your facility’s equipment, responsibilities and procedures.

Sources
232
Downloadable PDFs
47
Years
2002–2027

All sources

121–144 / 232

Technical guideFree to read

Consulting-Specifying Engineer 2016

Preventing arc flash in mission critical facilities

Run a preliminary arc-flash estimate at design stage and flag white-space panels above about 1.2 cal/cm2 or above PPE category 2.

  • NEC 240.87 (2014) requires arc energy reduction on overcurrent devices rated 1,200 A or higher.
Technical guideFree to read

Consulting-Specifying Engineer 2012

Preventing arc flash incidents by design

Arc-flash outputs should label both line and load sides of mains and compare normal versus maintenance-mode settings.

  • Incident energy above 1.2 cal/cm2 can cause second-degree burns; IEEE 1584 suggests a 2 s maximum arcing exposure time.
Research paperPDF

Fire (MDPI AG) 2026

Reframing Data Center Fire Safety as a Socio-Technical Reliability System: A Systematic Review

Ask for a fire-safety design file that covers a lifecycle plan (aligned with NFPA 75 and NFPA 76) including emergency response, damage control and post-fire recovery, not only prevention and suppression.

  • The search found 806 records (Scopus 330, Web of Science 476); twelve empirical studies were synthesised and benchmarked against NFPA 75 and NFPA 76.
Research paperFree to read

arXiv preprint (Oklahoma State University / New York University) 2026

Regime-Adaptive Weighted Ensemble Learning for Computing-Driven Dynamic Load Forecasting in AI Data Centers

For operations and grid-interaction features, use regime-aware (idle/ramp/high) minute-resolution IT load forecasting with job-scheduler signals (active jobs) as inputs, rather than only historical kW.

  • Relative to the strongest baseline (1D-CNN) the method improves NRMSE by 66.1% and NMAE by 80.2%.
RegulationPDF

European Commission, DG ENER (Viegand Maagoe and COWI) 2023

Reporting requirements on the energy performance and sustainability of data centres for the Energy Efficiency Directive - Task C report: EU repository for the reporting obligation of data centres

Plan an "EED report export" in the design and operations model that can pre-fill the EU database template: rated IT kW, floor areas, energy, water, heat reuse and renewable fields.

  • Incoming and outgoing data traffic (PB) must be less than the corresponding bandwidth (Gbps) x 3.942.
Research paperPDF

World Electric Vehicle Journal (MDPI AG) 2023

Research on Calendar Aging for Lithium-Ion Batteries Used in Uninterruptible Power Supply System Based on Particle Filtering

Plan UPS battery replacement from the RUL of the weakest cell rather than the string average; in a series string one cell sets the replacement date for the whole string even when others have years of life left.

  • Per-cell SOH estimation RMSE ranged from 0.15% to 9.07% (MAPE 0.16% to 6.85%).
Research paperPDF

arXiv (Texas Tech University) 2021

Short Circuit and Arc Flash Study on a Microgrid Facility

In a data-centre LV system with generator backup, run the arc-flash study for both grid-connected and islanded topologies, and check that the much lower islanded fault current (1,296 A instead of 22,793 A) does not lengthen clearing time.

  • A factor of 1.4 was applied to the datasheet maximum short-circuit current of inverter-based sources as a safety band.
White paperFree to read

Schneider Electric 2019

Solving Edge Computing Infrastructure Challenges

Provide an edge/micro data centre template: single-rack bundle of rack, UPS, rack PDU, cooling (passive default), sensors and cameras.

  • Prefabricated modules save about 50% of design and engineering time (WP 163).
Technical guideFree to read

TMMOB Makina Mühendisleri Odası (MMO) 2019

Fire extinguishing system functions and integration with other engineering disciplines (Söndürme Sistemleri Fonksiyonları, Diğer Mühendislik Disiplinleri ile Entegrasyonu)

When a room uses gaseous suppression, require HVAC damper/fan shutdown interlocks, a pressure-relief vent and a 10-minute hold-time integrity test in the commissioning list.

  • For clean-agent rooms, the minimum extinguishing concentration should be held for at least 10 minutes, verified by room integrity testing.
Research paperFree to read

arXiv preprint (Microsoft Azure Research / University of Illinois) 2025

TAPAS: Thermal- and Power-Aware Scheduling for LLM Inference in Cloud Platforms

Couple thermal and power headroom in the design tool: show how inlet temperature rise with outdoor conditions (for economiser or adiabatic systems) erodes GPU thermal margin and can trigger throttling.

  • GPU temperature must stay below a threshold (for example 85 C) beyond which hardware throttles computation.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.