Data Center Knowledge 2014
The Ergonomic Data Center: Save Us from Ourselves
Add maintainability checks: service clearances on the access side of each unit.
- A 2014 opinion piece; it contains no numerical criteria.
Topic guide
Review publications on site selection, building layouts and the physical arrangement of data centre infrastructure. Explore capacity, environmental conditions, access and expansion in the context of your project.
97–120 / 147
Data Center Knowledge 2014
Add maintainability checks: service clearances on the access side of each unit.
Schneider Electric 2012
Require design criteria (tier, density, capacity) to be derived from stated business goals before site and space tools are used.
Schneider Electric 2020
Add an environmentClass (it_space, commercial_office, industrial_harsh) plus indoor/outdoor flag that drives defaults and checks.
arXiv preprint (University of Alberta) 2026
In large-load interconnection negotiation, present AI load flexibility (a deferral window of up to about 3 hours) as a lever for interconnection capacity and timing; returns diminish beyond 3 hours.
Siemens 2017
Store Ur, Up, Ir, Ik/tk, Ip, LSC category, IAC rating and accessibility, insulation medium and busbar scheme in the MV switchgear catalogue.
Afet ve Acil Durum Yönetimi Başkanlığı (AFAD) 2018
In the site/structure module (TR profile), pull DD-2 spectral values from the AFAD map by coordinates.
Çakmak Avukatlık Bürosu 2026
Add a 'Türkiye incentive compliance' check: TS EN 50600 AC≥3, PC≥4, GL≥3.
Çakmak Avukatlık Bürosu 2026
In the site and energy module for Turkish projects, let users model PPA versus unlicensed self-generation (5(1)[h], with the 5 MW cap for 5(1)[c]) and storage.
Schneider Electric 2017
Give the module catalog functional block, form factor, indoor/outdoor rating, walk-in flag, shipping sections, footprint and height.
Uptime Institute 2017
Keep 'TIER-Ready (Uptime) status' as a metadata field in the prefabricated module catalog.
Türk Tesisat Mühendisleri Derneği (TTMD) - TTMD Dergisi 2021
In the site-selection tool, surface free-cooling hours by province for Turkish sites.
Panduit (Ning Liu), hosted by Cisco Year not stated
Use ER, MDA, HDA and EDA as physical planning roles and distinguish backbone from horizontal cabling.
Consulting-Specifying Engineer 2023
Flag hot-climate risks in site design checks: ambient above 115 F, and recirculation between chillers and generator exhaust; suggest CFD.
Open Compute Project Foundation 2022
Offer an 'OCP Ready' compliance profile that checks the delivery path (dock, ramps, door heights), floor load classes (uniform, concentrated, rolling), 3-phase IEC/NEMA rack circuits, hot/cold-aisle containment and generator load-acceptance time relative to BBU autonomy.
Uptime Institute Journal (Uptime Institute) 2020
Add a vestibule or airlock option to the edge enclosure template.
Schneider Electric 2021
In a portfolio/edge module let users model multiple sites with availability (or tier), headcount served and severity (1-5), compute series availability for dependent sites and rank sites by downtime x severity.
The Green Grid 2011
Support prefabricated module objects (power skids, container halls) as catalogue items with fixed capacity, footprint and interfaces.
The Green Grid 2012
In the site/cooling module, compute free-cooling hours from hourly weather against the selected ASHRAE class envelope rather than relying on maps.
The Green Grid 2014
In the layout module, report space metrics (IT kW per m2 of white space, racks per m2, white-space ratio) next to PUE/WUE as a SpUE-style indicator.
Google 2020
Add an "hourly CFE potential" score per candidate grid (grid CFE% plus PPA options) to site selection, beside annual renewable %.
BICSI 2024
Offer BICSI classes as an alternate standards profile alongside Uptime/TIA/EN, with an F1~Tier I/Rated-1/Class 1 ... F4~Tier IV/Rated-4/Class 4 table labelled 'conceptual equivalence only'
Telecommunications Industry Association 2024
In a 'TIA-942' standards profile, let users pick a rating per discipline (for example electrical Rated-3, mechanical Rated-3, telecom Rated-2)
Schneider Electric 2013
Use this paper as the template for the Design Basis form: target average kW per rack, peak kW per rack (default 2x average), density uncertainty (default 15%), managed power ratio (default 0.7) and reserve space (default 15%).
Open Compute Project Foundation 2020
Check the delivery route against rack height plus 0.5 m, door and corridor widths, and the lift capacity, before agreeing to host or design for Open Racks.
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.
Monthly newsletter · free
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.