The Green Grid 2021
Power Supply Efficiency Comparison at 380VDC versus 230VAC
In AC-vs-DC comparisons, do not assume a large PSU efficiency gain at 380 V DC.
- Data from roughly 30 units.
Collection
Technical references added to the library in the last 90 days.
553–576 / 1044
The Green Grid 2021
In AC-vs-DC comparisons, do not assume a large PSU efficiency gain at 380 V DC.
arXiv preprint (Emerald AI / EPRI / National Grid / NVIDIA / Oracle; submitted to IEEE) 2026
Add a 'flexible load' profile in the grid-connection module: committed reduction depth (%), response time (s), duration (h) and recovery, derived from the workload priority mix.
International Energy Agency 2026
In the grid-connection module, support firm and non-firm (curtailable, phased, dynamic-limit) options and size the BESS or genset capacity needed to ride through curtailment hours.
Hitachi Energy 2025
Support phased supply scenarios (off-grid hub then grid) with PV, BESS and generator sizing in the site/energy module.
EPRI (Electric Power Research Institute) 2024
When a user picks a US state, show regional data-centre load share and growth scenarios as context for utility interconnection lead times.
Schneider Electric 2011
Record the cord count (single or dual) of each IT device in the rack model and compute the single-corded share.
BICSI ICT Today 2026
For AI templates, default to single-mode fiber, high-count trunks and dedicated back-end fabric pathways.
IEEE Transactions on Industry Applications (Institute of Electrical and Electronics Engineers (IEEE)) 2026
In battery-room arc-flash labelling, calculate the self-extinguishing model alongside the maximum power method rather than using the latter as the only reference, and check cases where excessive PPE categories make maintenance impractical.
Applied Sciences (MDPI AG) 2022
In ASD pipe network design, account for dilution of obscuration by hole count and distance from the detector; for long, many-hole pipes, verify time to alarm threshold and sensitivity by calculation.
Sensors (MDPI AG) 2022
In siting, do not use PUE as the only criterion; evaluate it together with electricity cost (tariff) and carbon (CUE, grid mix) estimates derived from PUE, since a low-PUE site may have a high tariff or carbon-intensive grid.
Vertiv 2019
Add a delivery-method attribute per block (stick-built, skid, power module, prefab room/facility) with factory-test status and shipping-split count.
Data Center Knowledge 2018
Model the campus as power blocks with block-level MEP independence and fire zones.
IEEE 2017
Include hose, quick-disconnect and fitting losses explicitly in the tool's rack-level hydraulic calculations, not just cold-plate pressure drop.
Consulting-Specifying Engineer 2016
Run a preliminary arc-flash estimate at design stage and flag white-space panels above about 1.2 cal/cm2 or above PPE category 2.
Consulting-Specifying Engineer 2012
Arc-flash outputs should label both line and load sides of mains and compare normal versus maintenance-mode settings.
Applied System Innovation (MDPI AG) 2026
For predictive cooling control, plan at least one inlet and one outlet temperature sensor per rack; below that, prediction error rose by about 22%.
Fire (MDPI AG) 2026
Compare BESS compartmentation quantitatively: two compartments halve HF dose and IDLH clearance time, but IDLH is still exceeded for anyone in the room in full thermal runaway, so runaway prevention (BMS integrity, UL 9540A containment, emergency power off) must stay the primary control.
Open Compute Project Foundation 2025
Define a 2 MW CDU catalogue template for liquid-cooling layouts: dimensions, wet weight (6910 lb) for slab loading, 74 kW parasitic load, 3 C approach and 0.25 GPM/kW facility flow.
Energy and Buildings (Elsevier) 2021
Use the prototype densities and the approach-temperature concept to calibrate the tool's hourly cooling model and containment effectiveness.
ASHRAE / The Green Grid 2014
In the PUE calculator, support partial PUE and measurement categories.
7x24 Exchange Magazine 2025
Adopt these category codes (LD...EHD) as a rack density class derived automatically from kW/rack.
Uptime Institute Journal 2020
Ask users for modal and peak rack density separately, not just the average, and size cooling and power for the peak cluster.
Legrand 2015
For A/B rack feeds, check that the sum of both feeds' peak load stays below 80 % of one branch breaker (failover check) and warn when only average load is entered.
Schneider Electric 2014
Give each data hall a floor-system parameter: raised air plenum, raised piping only, or hard floor.
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.
Monthly newsletter · free
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.