Technical guidePDF

U.S. DoD (UFC) 2023

UFC 3-540-01 Engine-Driven Generator Systems for Prime and Standby Power Applications (1 August 2014, Change 3, 26 January 2023)

Include transient and steady-state loads, transformer inrush, motor starting and UPS load in the generator sizing study, and calculate UPS charging load using the minimum charging current allowed while on generator.

  • Harmonic analysis is required when switching power supplies make up 25% or more of the system load.
Technical guidePDF

U.S. DoD (UFC) 2019

UFC 3-550-01 Exterior Electrical Power Distribution (1 September 2016, Change 3, 01 November 2019)

Settle the loop or alternate-feed arrangement and the maintenance isolation points for the MV run from utility entry to the building early; the text treats shortening maintenance outages as a direct design driver.

  • Elbow-type arresters go at the ends of all radials and at normally open loop points, for all voltages above 5 kV.
Technical guidePDF

U.S. DoD (UFC) 2021

UFC 3-600-01, Fire Protection Engineering for Facilities (8 August 2016, Change 6, 6 May 2021)

Build the data hall protection concept in this order: very early warning smoke detection, wet-pipe sprinklers throughout, clean agent only as an addition, and state in the specification that clean agent cannot replace the sprinklers.

  • Stand-alone telecommunication facilities over 2,500 ft2 (232 m2) need clean agent or sprinklers; over 7,500 ft2 (696 m2) sprinklers are required and clean agent may only be added.
Technical guidePDF

U.S. DoD (UFC) 2024

UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings (12 December 2018, Change 3, 24 May 2024)

On the site plan check the minimum standoff between the security line, clear zone and building (20/50 ft) and the 33 ft unobstructed space; define for outdoor chillers, generators and fuel tanks a no-concealment layout or a four-sided enclosure.

  • Low-leakage dampers are limited to 3 cfm/ft2 (15 L/s/m2) at 1 in. w.g. (250 Pa) differential.
Technical guideFree to read

Uptime Institute 2026

Uptime Institute Tier Classification System

Model 'reliability.target' as an enum {TierI..TierIV} driving topology defaults: Tier I single path N; Tier II N+1 capacity components, single path; Tier III N+1 components AND two distribution paths (one may be passive), concurrently maintainable; Tier IV 2N or 2(N+1), two active physically compartmentalized paths and continuous cooling with UPS-backed pumps/fans.

  • Over 4,300 Tier Certification awards in 120+ countries (2026).

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.