Cummins 2014
Alternator winding pitch and power system design
Add a windingPitch field to the alternator catalog and require 2/3 pitch (or flag) for LV 4-wire generator systems.
- 5/6 pitch Kp: 0.97, 0.71, 0.26, 0.26.
The engineer’s reference desk
73–96 / 1,044 sources
Cummins 2014
Add a windingPitch field to the alternator catalog and require 2/3 pitch (or flag) for LV 4-wire generator systems.
Cushman & Wakefield 2026
Use as context only: it supports defaulting to large-campus templates in North American projects.
IEEE 2023
Record controller type and supply-temperature stability (e.g. +/- C) in CDU catalogue entries.
Schneider Electric 2021
Give every network-managed infrastructure device (UPS card, rack PDU, CRAC/CRAH controller, BMS gateway, sensor) catalogue fields for TLS support, RBAC support, IEC 62443-4-2 certification (SL level) and SDL certification.
Vertiv 2018
Give the battery catalogue chemistry (LFP/NMC/LMO/VRLA), kWh per cabinet, UL 1973 / IEC 62619 listing, BMS level and approved UPS models.
Energies (MDPI AG) 2018
In airside economiser design, plan exhaust grilles and the building envelope so recirculation stays below 5%; 15% recirculation raised energy about 6.1% for direct and 9% for indirect.
Monthly newsletter · free
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
Schneider Electric 2016
Offer reference architectures 'traditional 2N', 'OCP 1N', 'OCP 2N (no central UPS, 1N BBU)' and 'simplified 2N mixed-load (single UPS path)' in the topology builder; let a rack type declare power shelf, BBU runtime and PSU redundancy.
ITEGAM- Journal of Engineering and Technology for Industrial Applications (ITEGAM-JETIA) (GN1 Sistemas e Publicacoes Ltd.) 2021
Choose online double-conversion UPS for loads where power quality improvement is expected; an offline UPS passes harmonics and unbalance through to the load side.
Vertiv 2016
Add a pumped-refrigerant economizer DX type to the cooling-option library, with economizer hours modelled as a function of ambient, load fraction and return-air temperature.
European Commission 2026
Translate PUE and WUE targets into A-G classes: class A needs a design PUE of 1.15 or below and WUE of 0.1 or below; the class D boundary is 1.5 and 0.6. Write the class target into the design specification.
Uptime Institute 2020
In reliability explainers, state that physical redundancy covers only part of outage risk.
Uptime Institute 2023
Present outage statistics in the reliability report with uncertainty caveats rather than as precise probabilities.
Uptime Institute 2024
Use it as a reference for annual outage statistics when justifying redundancy in the power chain.
ASHRAE 2020
In the CRAC catalogue, record rated capacity and efficiency (NSenCOP) on the basis of AHRI 1360 / ASHRAE 127 test conditions.
ASHRAE 2022
In the compliance calculator, compute annualised MLC and design ELC per segment (UPS, distribution, PDU) and compare them with climate-zone limits.
BICSI (via Cabling Installation & Maintenance) 2019
Keep BICSI 002 edition history (2014, 2019, 2024) in the standards registry for projects citing older editions.
BICSI 2024
Reference the current edition of this standard in the operations checklist module.
Telecommunications Industry Association (TIA) 2024
Offer a rating-level selector (Rated-1..4) that is separate from Uptime Tiers.
Aksa Power Generation 2026
Add ESP and DCP kW/kVA, rated current, fuel l/h at 50/75/100%, exhaust flow and heat, radiator airflow and allowable external static, dimensions/weight and base tank as generator catalog fields.
Consulting-Specifying Engineer 2016
Define the IT room default as 1-hour separation, 3/4-hour doors and fire and smoke dampers at penetrations.
Uptime Institute Journal (Uptime Institute) 2015
Include an arc flash incident-energy study placeholder and a labelling output for each switchboard in the electrical module.
Siemens 2020
In the arc-flash module, evaluate incident energy at the LV main line-side terminals using the upstream MV device's clearing time, not the LV main's.
Standards (MDPI AG) 2026
Schedule the arc-flash study after the coordination study and make that order a mandatory step in the project plan and model.
Energies (MDPI AG) 2023
For an operational thermal twin, define adequate sensor density covering supply, return, cold-aisle and hot-aisle temperatures and equipment power (728 points at 15-minute sampling in this study).