White paperFree to read

Schneider Electric 2021

An Overview of Cybersecurity Best Practices for Edge Computing

Give every network-managed infrastructure device (UPS card, rack PDU, CRAC/CRAH controller, BMS gateway, sensor) catalogue fields for TLS support, RBAC support, IEC 62443-4-2 certification (SL level) and SDL certification.

  • IEC 62443 has four parts; 4-1 covers secure product development and 4-2 the technical security requirements for components.
Research paperPDF

Energies (MDPI AG) 2018

Analysis of Air-Side Economizers in Terms of Cooling-Energy Performance in a Data Center Considering Exhaust Air Recirculation

In airside economiser design, plan exhaust grilles and the building envelope so recirculation stays below 5%; 15% recirculation raised energy about 6.1% for direct and 9% for indirect.

  • The authors recommend placing exhaust-air grilles so recirculation is below 5%, or handling it in the envelope plan at design stage.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

Research paperPDF

ITEGAM- Journal of Engineering and Technology for Industrial Applications (ITEGAM-JETIA) (GN1 Sistemas e Publicacoes Ltd.) 2021

Analysis of Power Quality Parameters at Comparing UPS of Different Technologies

Choose online double-conversion UPS for loads where power quality improvement is expected; an offline UPS passes harmonics and unbalance through to the load side.

  • Output power factor: offline UPS 0.95, online UPS 0.97 (PRODIST range 0.92-1.00).
RegulationPDF

European Commission 2026

Annexes 1 to 3 to Commission Delegated Regulation C(2026) 3472 - EU data centre energy (PUE) and water (WUE) efficiency classes, data centre label, and amendments to Delegated Regulation (EU) 2024/1364

Translate PUE and WUE targets into A-G classes: class A needs a design PUE of 1.15 or below and WUE of 0.1 or below; the class D boundary is 1.5 and 0.6. Write the class target into the design specification.

  • WUE classes: A <= 0.1; B 0.1-0.2; C 0.2-0.4; D 0.4-0.6; E 0.6-0.8; F 0.8-1.0; G > 1.0.
Technical guideFree to read

Consulting-Specifying Engineer 2016

Applying NFPA 75 in data centers

Define the IT room default as 1-hour separation, 3/4-hour doors and fire and smoke dampers at penetrations.

  • Doors in the separation must be 3/4-hour rated.
Technical guideFree to read

Uptime Institute Journal (Uptime Institute) 2015

Arc Flash Mitigation in the Data Center

Include an arc flash incident-energy study placeholder and a labelling output for each switchboard in the electrical module.

  • Incident energy is measured in cal/cm2.
White paperFree to read

Siemens 2020

Arc-fault mitigation in unit substations (white paper)

In the arc-flash module, evaluate incident energy at the LV main line-side terminals using the upstream MV device's clearing time, not the LV main's.

  • MV primary fuse clearing: about 900 ms and 38.3 cal/cm2; LV main with 0.4 s short-time delay: 17.0 cal/cm2.
Research paperPDF

Standards (MDPI AG) 2026

Arc-Flash Hazards: Standards Development Framework in Facilities of National Importance in Healthcare and Data Centers

Schedule the arc-flash study after the coordination study and make that order a mandatory step in the project plan and model.

  • Example studies assumed available utility fault current of 21,000 A for the 440 V residential service and 21,000-40,000 A for the 480 V/1200 A commercial service.