Technical guideFree to read

Lawrence Berkeley National Laboratory / U.S. Department of Energy 2017

Data Center Air Management Estimator, Version 1.0 (2017)

Offer a 'quick' airflow-management estimate mode with few inputs, consistent with the DOE AM Tool engine already in the library (engineering reference v3).

  • Distributed as an Excel file (AM Estimator Version 1-0), posted 06/27/2017.
Technical guideFree to read

Upsite Technologies blog 2019

Data Center Airflow Management at 100F

When high-temperature (A2/A3 allowable) set points are selected, report hot-hour and mechanical-cooling percentages from site weather.

  • Air-side economization hours above 90 F: Denver 111 (A2) / 226 (A3); Phoenix 694 / 1,817.
Technical guideFree to read

Eaton 2025

Data Center as a Good Grid Citizen

Add grid-code parameters to the utility connection object: UFLS stages, LVRT curve, post-fault power recovery ramp (%/s) and short-circuit ratio at the PCC.

  • Typical BESS Li-ion cells are limited to about 1C discharge.
StandardFree to read

ASHRAE / IBPSA-USA 2022

Data Center Chiller Plant: Simulation-based Comparative Control Design Case Study (2022 ASHRAE/IBPSA-USA Building Performance Analysis Conference and SimBuild)

Give cooling plant templates a control-sequence attribute (for example Guideline 36 condenser-water reset, economizer modes); it materially changes annual energy.

  • Alternative (Guideline 36-based) controls cut cooling energy 25% annually and about 18% in a typical summer.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

Research paperPDF

arXiv (University of Michigan preprint) 2026

Data Center Cooling Choices Shift Water Impacts Across the Grid: An Integrated Water-Energy Model for Sustainable Data Center Development

In cooling selection, calculate direct and indirect water together: an air-cooled chiller cut direct water 97% but raised the indirect share to 96.6% and electricity by 32%.

  • Indirect water intensity varied by about 50% across months, depending on which generators supplied the added load.
Technical guideFree to read

Lawrence Berkeley National Laboratory, Center of Expertise for Energy Efficiency in Data Centers 2023

Data Center Electrical Power Chain Tool, v2.5 (July 2023)

Benchmark the electrical loss model against this tool's structure: transformer, UPS and PDU efficiency curves by load factor, plus eco-mode.

  • The July 2023 update added transmission and distribution (T&D) losses.
Research paperPDF

Buildings (MDPI AG) 2024

Data Center Energy Evaluation Tool Development and Analysis of Power Usage Effectiveness with Different Economizer Types in Various Climate Zones

Choose economiser type by climate zone: consider indirect economisers in 0A/0B and wet zones (PUE 0.03-0.07 lower) and adding evaporative cooling in dry zones (0.02-0.05).

  • More than 95% of a data centre's total cooling load comes from heat generated by IT equipment.
Technical guidePDF

Open Compute Project Foundation 2026

Data Center Facility - Low Voltage Direct Current Power Distribution, Version 1.1.0

Choose the voltage class with LV limited to 1500 VDC; check that sources stay below it in steady state (for example 750 V per pole) and that device voltage windows fit; 800 V devices with only a +/-5% range cannot operate below 750 V and are unusable there.

  • Moving backup energy storage out of the rack frees 12-16 OU, 27-36% more space in a 44 OU rack.
Research paperFree to read

arXiv preprint (University College Dublin) 2025

Data Center Model for Transient Stability Analysis of Power Systems

Expose UPS transfer thresholds (voltage %, frequency Hz), return-to-mains delay and staggering across UPS modules as design parameters, and warn when all modules share identical thresholds and delays, since synchronised reconnection can re-trip the grid.

  • Cooling accounts for about 30% of total power of standalone data centers and is modelled as an induction motor.
Technical guideFree to read

Consulting-Specifying Engineer 2013

Data center power strategies

Offer distribution-voltage options (208/120, 415/240, 380 Vdc) with automatic loss and fault-current comparison.

  • 600 Vac reduces copper and fault current but yields no efficiency gain.
Technical guideFree to read

Aksa Power Generation 2020

Data Center Power Systems

Keep both standby and DCC kVA per model in the generator catalog; where data is missing, use DCC ~0.9-0.94 x standby as a flagged estimate.

  • Data-centre generator range up to 3,000 kVA standby.
White paperFree to read

Schneider Electric 2012

Data Center Projects: Advantages of Using a Reference Design

Store reference designs as structured objects with required attribute fields (IT kW range, redundancy N/N+1/2N for power and cooling, density kW/rack, annualized PUE, heat rejection type, estimated cost) plus linked one-lines, layouts and BOM lines (part number, qty, supplier).

  • Graphics: electrical, mechanical and IT one-lines; layouts with dimensions and clearances of racks, PDUs, CRAC/CRAHs, UPSs, generators, switchboards, ATSs; 3D views.
White paperFree to read

Schneider Electric 2015

Data Center Projects: Establishing a Floor Plan

Run the layout engine on a 600 mm / 2 ft grid with row-pair pitch presets A-D (14/16/16/18 ft), auto-selected from raised-floor, rear-door accessory, containment and density inputs.

  • Rack-location estimate: room area / 28 sq ft (2.6 m2) per rack.
White paperFree to read

Schneider Electric 2012

Data Center Projects: Growth Model

Capture the IT load profile at project setup as four fields (initial kW, minimum final kW, maximum final kW, ramp-up years, default lifetime 10 years), not one design load.

  • kW = BTU/hr x .000293 and kW = tons x 3.52; each IT watt becomes a watt of heat, so the cooling profile equals the load profile.
White paperFree to read

Schneider Electric 2013

Data Center Projects: System Planning

Build an intake wizard that makes the six parameters (criticality/Tier, IT kW, growth ramp with uncertainty, target PUE, average and peak kW/rack, capex budget) required before layout tools unlock, with live trade-offs between them.

  • Preferences are adjustable (overhead power cabling, wide racks); constraints are hard (slab height, floor load, columns, codes, TIA 942, work rules, elevator weight capacity).