Technical guidePDF

Open Compute Project Foundation 2022

Open Rack V3 BBU Shelf Specification, Rev 1.1

Model ORV3 in-rack BBU as an alternative to a central UPS and check that generator start and transfer time fit inside the roughly 4-minute window at rated load per shelf.

  • Each BBU shelf holds one PMI module and six 3 kW BBU modules in 5+1 redundancy.
Technical guidePDF

Open Compute Project Foundation 2026

Open Rack V3 High Power (60A) AC WHIP Power Cable Design Specification, Revision 1.1.0 (11 November 2026)

Add a high-power ORV3 feed type (60 A 480 V / 63 A 400 V IEC 60309) to the busway/receptacle catalogue and size each whip at 48 A continuous in North America for power-shelf capacity checks.

  • Assembly must be UL Listed per UL 817 and CE certified; parts to UL 62/UL 758; connectors tested to IEC/EN 61984 and IEC 60512.
Technical guidePDF

Open Compute Project Foundation 2026

Open Rack Wide (ORW) Base Specification, Revision V1.0.1 (effective May 5, 2026)

Add an ORW rack family whose footprint, height and payload come from the chosen design specification rather than fixed defaults, prompt users for those values, and warn that floor-loading and aisle-pitch checks depend on them.

  • The frame accepts air-cooled or liquid-cooled 48 V busbars; busbar mounting interfaces are identical to ORV3 HPR.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

Technical guideFree to read

Consulting-Specifying Engineer 2008

Outdoor air in data centers

In the tool's economizer studies, report hours below the humidity floor alongside energy savings, per climate.

  • NEBS levels 1-3 per SR-3580; level 3 applies to central-office equipment; key documents GR-63-CORE and GR-1089-CORE.
White paperFree to read

Eaton 2020

Parallel UPS Systems

Add maxParallelUnits, paralleling architecture (distributed or centralised bypass) and static switch rating to the UPS catalogue.

  • N+1 alarm: five 100 kVA modules alarm when load exceeds 400 kVA.
Technical guideFree to read

Caterpillar 2018

Paralleling Generator Set Systems and Design

Build an architecture selector with the three options and show consequences: LV-only limit for on-set, required breaker closing speed, and master-controller need for complex sequences.

  • The connecting device needs about 5-cycle close/open speed to avoid out-of-phase paralleling.
Research paperPDF

Buildings (MDPI AG) 2024

Performance and Applicability Analysis of Indirect Evaporative Cooling Units in Data Centers Across Various Humidity Regions

Assess an IEC unit by climate: natural cooling covered 97% of the year in a dry climate and 43% in a humid one; check the wet-bulb distribution (19 °C threshold) against project climate data.

  • Against packaged air-cooled DX units, IEC energy savings were 57.46% (Urumqi), 48.26% (Beijing) and 39.41% (Shanghai).
Research paperPDF

Frontiers in Energy Research (Frontiers Media SA) 2023

Performance evaluation and modeling of active tile in raised-floor data centers: An empirical study on the single rack

With active tiles, always seal under-rack gaps; if left open, low pressure at the tile surface pulls hot air in under the rack and worsens the lower servers.

  • CRACs were set to 21 °C but delivered 23 °C supply, and thermal load was about 65% of cooling capacity, so one CRAC was off.
Research paperPDF

Journal of Thermal Analysis and Calorimetry (Springer Science and Business Media LLC) 2025

Performance improvement of high-density data center via two-phase liquid immersion cooling

Verify two-phase immersion PUE claims so they include the external heat-rejection loop (exchangers, pumps, pipes) and not just tank-level power; the 1.01 figure excludes it.

  • The study considers high-density data centres with a capacity of up to 1168 kW.
White paperFree to read

Schneider Electric 2011

Physical Security in Mission Critical Facilities

Assign each room a security zone level and verify every path into the white space crosses zones in increasing order, with no direct door from a low zone to a much higher one.

  • Openings wider than 12 inches (about 300 mm) get tamper-proof grills.
Research paperFree to read

arXiv preprint (Microsoft Azure) 2023

POLCA: Power Oversubscription in LLM Cloud Providers

In the power planner, apply different diversity and oversubscription factors by workload: inference rows can be provisioned below sum-of-nameplate (for example peak about 80% of provisioned), while training rows should assume near-coincident peaks with only about 10% headroom.

  • POLCA allows 30% more servers in the same inference GPU cluster while maintaining SLOs.
Research paperPDF

Geothermal Energy (Springer Science and Business Media LLC) 2026

Potential of aquifer thermal energy storage (ATES) for data centres in Germany

Before linking data-centre waste heat to nearby building heating, check that site subsurface geology suits ATES and that the site is outside water-protection zones; only 13 of 19 sites did.

  • Annual waste heat available for storage was Eth = Qth × F_load × (1 − F_free) × (1 − F_down), with a conservative mean annual load factor of 0.6.