In the building/sustainability module (TR profile), add an NSEB check for buildings of 2,000 m2 and above: target class B and at least 10 percent of primary energy from on-site renewables.
The text is consolidated with the 2025-2026 amendments.
For multi-site designs add a monitoring-coverage check: every UPS, cooling unit, rack PDU and environmental sensor needs a network management interface, otherwise warn unmonitored device.
In allocating carbon to data-centre users, give idle power to whoever holds the resource allocation and share dynamic power by actual usage; because an idle server draws about 45% of peak power, the idle share is large.
Resources with equivalent busy power used to weight idle-power allocation: 1 Intel Skylake N1 CPU core = 20 GiB RAM = 1 TiB SSD = 6 TiB HDD.
Add an hourly 24/7 CFE coverage calculator to site and energy design that sizes wind, solar, BESS (in hours of IT load) and server headroom together; use hourly or sub-hourly supply profiles, never daily averages.
Consider shifting temporally flexible workloads (completable within 24 hours) to hours of lower carbon intensity and lower power peak as an option in data-centre grid-connection negotiation and power capacity planning.
A piecewise-linear model of power versus CPU usage achieves daily MAPE below 5% for more than 95% of power domains.
Do thermal verification of failure mode (two ACUs offline) with realistic air leakage (cabinet gaps, HAC panel joints); a leak-free model can comply while the leaky model exceeds 32 °C.
The grid study selected 7,288,454 cells with the standard k-epsilon model and wall functions.
When modelling a server as a porous block in room-scale CFD, use Darcy-Forchheimer coefficients fitted to a resolved pressure-drop curve rather than generic assumptions such as porosity 0.5.
Twenty simulations were run for flow rates of 0.003 to 0.06 m³/s, and steady-state results matched time-averaged transient results.
Extend the generator catalogue with technology type (diesel, HVO, gas, H2 ICE, PEM fuel cell), emissions factor relative to the 1742 lb/MWh baseline, start time, block-load capability and NFPA 110 level.
Overload 110% for 60 s and 150% for 3 s; transient voltage response to ISO 8528-5 G3; steady-state frequency within +/-0.5%.
Add embodied-carbon fields (kgCO2e; data source: EPD / TM65 / spend-based) to catalogue items and roll them up per design, reporting the share from supplier-specific EPDs.
Data centers used about 460 TWh in 2022, nearly 2% of global electricity.
In early data-centre design, set PUE and WUE targets by size class, cooling system and climate zone using this study's ranges (for example 1.71-2.22 for small rooms, 1.12-1.25 for large scale).
Airside economisers with adiabatic cooling (case 1) use less water than airside economisers alone (case 3).
For in-row and RDHx designs, evaluate cooling redundancy per aisle or row, not per room, and check unit throw distance to the farthest rack under N-1.
A planned electrical outage may take out no more than the redundant number of cooling units in any single aisle; 2N CCC with A/B split simplifies this.
Add an "EU Taxonomy 8.1" compliance profile: a Code of Conduct expected-practice checklist with justification fields for non-applicable items, and a refrigerant GWP <= 675 check in the cooling catalogue.
8.1 is a transitional activity under Article 10(2) of the Taxonomy Regulation.
As labels will be issued every year from 15 August 2027, set PUE and WUE class targets (Annex I) at design stage for new and existing sites and build the metering infrastructure to the reporting requirements.
Labels are generated automatically by the European database every year from 15 August 2027 and are publicly available electronically in all official Union languages.
When validating server PSU data against the 2023 tier, apply an informational exception, not a hard error, for units placed on the market during 2023 (legacy stock).
The Commission expects the problem to be short-term and largely resolved before 1 January 2024.
Show in the operations module whether site annual energy crosses 10 TJ (audit) or 85 TJ (certified ISO 50001 energy management system); in unit terms 10 TJ is about 2.78 GWh and 85 TJ about 23.6 GWh.
A cited study gives audit payback of 3.1 years or less, and under 1.16 years for enterprises above 10 TJ.
When testing the 1 MW waste heat threshold, compute "total rated energy input" from rated capacity (for example utility connection or rated IT plus infrastructure), not modelled annual energy, and take the measurement point at the handover of electricity supply.
CBA thresholds: thermal electricity generation 10 MW, industrial installation 8 MW, service facility 7 MW, data centre 1 MW.
In the IT equipment catalogue store PSU efficiency at 10/20/50/100% load, power factor, active state efficiency (SERT/EN 303470) and declared operating class A1-A4, and validate new models against the 2023 tier.
Secure data deletion applies from 1 March 2020; latest firmware and security updates must be made available from 1 March 2021.
In equipment catalogue validation cite EN 303470 (SERT) as the test basis for server efficiency fields and record the declared operating class as tested.
Article 6 bans products that detect testing and alter performance; Annex IV treats such a model as non-compliant.