In the power-quality check compute THDv at the PCC for every supply mode (both transformers, one transformer, generator only); generator mode is usually the worst case.
Design to 5% THDv at the PCC rather than THDi <= 5% or 8% at each drive.
Offer a 'North America 415/240 V' one-line template (480 V UPS, auto-transformer RPP/PDUs, isolation transformer on UPS bypass) next to the traditional 480 to 208/120 V.
IEC C14 and C20 are rated only to 250 V; 240 V circuits use C13/C19.
In selling data-centre waste heat, set heat-pump COP by cooling type (all-liquid 6.3, mixed 5.5, air-cooled 4.1) and include electricity price sensitivity in the feasibility study.
The Espoo DH network serves over 80% of the population in Espoo and neighbouring cities, with total annual heat demand of about 2.6 TWh.
In power-chain loss calculators for AI halls, do not evaluate PSU, UPS and transformer efficiency only at average load; accept a load-profile descriptor (duty cycle, high/low power, frequency).
Cycle efficiency is computed as (D*PH + (1-D)*PL) / (D*PH/etaH + (1-D)*PL/etaL).
In the liquid-cooling catalogue store coupling size, OCP compliance, maximum working pressure, flow coefficient/pressure drop, disconnect-under-pressure limit and wetted materials.
Sizes -02, -04, -06, -08 with ORB, hose-barb and BSPP ends.
Add an on-site energy/DER layer: sources utility, diesel_standby, gas_chp, cchp_absorption, pv, wind, fuel_cell, bess with a continuous vs standby flag.
Cybersecurity aligned with IEC 62443-4-2 and IEC/ISA 62443-3-3.
Add tenantId and commercialStatus (open, closed, reserved, internal) to racks, cages and floor zones, with a floor-plan overlay coloured by status and per-zone remaining power, cooling and ports.
Preferred: SNMPv3, BACnet and APIs; integration with BMS, EPMS, ITAM and ticketing.
Give every asset type, serial, rack/U location, network port, explicit A/B power path (rack PDU, UPS, PDU, switchgear) and cooling-unit dependency so the design exports as a DCIM digital twin.
Integration via APIs or SNMP MIB; SNMPv3 recommended for multi-vendor data.
Add expected-life defaults to the asset catalogue (LV switchgear 15-25, MV switchgear 30-40, UPS 10-15 years), insulation medium for MV gear (SF6 or SF6-free), refrigerant with GWP for cooling units, and links to PEP/EPD documents.
UPS life is 10-15 years; a UPS at 25% load or lower is a candidate for a smaller unit.
Give edge and closet room templates a default monitoring package: door switch, temperature at 3 heights, leak detector, camera, network management card on UPS and cooling, and metered/switched PDUs with sequencing.
Example alerts: rack bottom 62 °F (16 °C); rack door open over two minutes.