1,044 sources

Sources

481–504 / 1,044 sources

White paperFree to read

Schneider Electric 2012

Making Large UPS Systems More Efficient

Store UPS losses as a three-coefficient model (no-load, proportional, square-law) or a 0/25/50/75/100% curve, and record whether quoted efficiency includes input filters or transformers.

  • Cooling adds 0.4 kW per kW of loss.
Research paperPDF

Scientific Reports (Springer Science and Business Media LLC) 2025

Maximizing waste heat recovery from a building-integrated edge data center

In a building-integrated edge data centre, distribute workload to servers so outlet temperatures are as high as possible (within standard limits); recoverable heat rose by up to 17.1% over random distribution.

  • Compared with randomly distributed workloads, MOTA improves waste-heat recovery by up to 17.1%.
Research paperPDF

arXiv preprint (cs.SE); Skyworkz / Sustainable Digital Infrastructure Alliance (SDIA) 2023

Measuring IT Carbon Footprint: What is the Current Status Actually?

Compute IT carbon as (Es + Eo) × I + M and allocate embodied carbon (M) for shared resources by time and resource share; define scope, idle-time and shared-resource attribution explicitly.

  • Operational carbon = PUE × sum over intervals of grid-mix intensity × energy, constrained by energy-mix data granularity (for example 30-minute updates); average versus marginal emission factors are discussed.
Technical guideFree to read

Consulting-Specifying Engineer 2023

Medium voltage increases savings to power multistory data centers

Offer an MV distribution template (13.2 kV, main-tie-tie-main, separated rooms) for multistory halls and compute conduit and cable quantities against 480 V.

  • Multiple control-power sources are switched by an 83 relay, one fed directly from the on-site generator, plus a black-start relay.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

Technical guideFree to read

Legrand 2025

Meeting the Demands of Flexible Data Center Design

In the cabinet catalogue record supported PDU mounting positions (count, inside/outside, 0U slots) and whether mounting is toolless.

  • Combination C13/C19 outlets accept both C14 and C20 plugs, easing IT refreshes.
Research paperPDF

IEEE Transactions on Sustainable Computing (Institute of Electrical and Electronics Engineers (IEEE)) 2017

Metrics for Sustainable Data Centers

In data-centre comparisons, do not use PUE as a cross-facility metric; normalise for IT load, weather and location, or state the same conditions.

  • Tier availability figures quoted: Tier I 99.671%, Tier II 99.741%, Tier III 99.982%, Tier IV 99.995%.
White paperFree to read

Schneider Electric 2011

Modular Systems: The Evolution of Reliability

In the availability model give each UPS and cooling unit a failure-domain attribute (racks lost on its failure) alongside MTBF, so users can compare one large UPS with distributed or modular N+1 options by blast radius, not just component count.

  • IT equipment changes every 2 to 3 years, while traditional infrastructure is deployed once for projected maximum load.
Research paperPDF

Frontiers in Environmental Science (Frontiers Media SA) 2026

Net sustainability assessment of AI-driven data centers in the GCC: an MCDA approach framework

In AI data-centre investment assessment in hot, arid regions, weigh carbon, water, social and governance criteria together with explicit weights (0.40/0.25/0.20/0.15); indirect water (desalination energy) was about 0.68 times direct cooling water.

  • In the extended boundary, embodied carbon adds 15-25% to the operational footprint.
Technical guideFree to read

Uptime Institute Journal (Uptime Institute) 2021

New ASHRAE guidelines challenge efficiency drive

Tie the humidity control setting to the contamination class: allow the 70% RH upper limit only when coupon test results are entered and within limits.

  • The 5th edition includes a new high-density class.