Research paperPDF

Springer Science and Business Media LLC (preprint) 2026

Design and Development of a Next-Generation Medium-Voltage Architecture for AI Data Centre Infrastructure

Make the 0.1-10 Hz oscillation, 1.40 peak-to-mean ratio and coincidence factor explicit inputs in the AI campus load model, and check storage and buffering against grid ramp limits.

  • Conductor mass falls by 97.1%, electrical footprint by 58.1%, annual PUE from 1.42 to 1.11 and 15-year TCO by 32.4%.
Research paperPDF

WSEAS TRANSACTIONS ON POWER SYSTEMS (World Scientific and Engineering Academy and Society (WSEAS)) 2026

Design and Prototype of a Microgrid for Enhancing Reliability of Power Supply for Artificial Intelligence Data Centers

Follow the energy-balance chain in a PV/BESS sizing helper (daily load split, conversion losses, usable depth of discharge, power rating against night peak); report usable-energy duration rather than nameplate duration and make DoD an explicit input.

  • Covering 60% of demand needs 81,857 kWh/day from PV after 5% DC-AC and 10% battery losses.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

Technical guideFree to read

ABB 2008

Directional protection and directional zone selectivity

For main switchboards with two transformers plus bus tie, or generator paralleling boards, flag that conventional time selectivity cannot discriminate fault direction and propose directional or directional-zone selectivity on incomers and bus tie.

  • Without auxiliary power it degrades to plain directional protection with t7FW/t7BW times.
RegulationPDF

European Parliament and Council of the European Union 2023

Directive (EU) 2023/1791 of the European Parliament and of the Council of 13 September 2023 on energy efficiency and amending Regulation (EU) 2023/955 (recast) - Energy Efficiency Directive

If the site's installed IT power is 500 kW or more, provide in the design for the annual Annex VII reporting and the monitoring infrastructure (energy, power utilisation, temperature set points, waste heat, water, renewables); measurement is based on the EN 50600-4 family.

  • Art. 12(2): data centres serving exclusively defence and civil protection are excluded.
Research paperPDF

Frontiers in Energy Research (Frontiers Media SA) 2022

Discussions of Cold Plate Liquid Cooling Technology and Its Applications in Data Center Thermal Management

For loads of 50 kW per rack and above, evaluate a hybrid cold-plate scheme (main loads on cold plates, remaining heat in air) for a PUE target below 1.2.

  • Cabinets with enclosed water-cooled backplanes can save nearly 35% of annual energy compared with air-cooled backplanes.
Technical guidePDF

U.S. Department of Energy / Federal Register 2025

Accelerating Speed to Power/Winning the Artificial Intelligence Race: Federal Action To Rapidly Expand Grid Capacity and Enable Electricity Demand Growth (Request for Information, September 18, 2025)

When planning a large load connection, query the interconnection queue, transmission congestion and reconductoring potential for the relevant grid region early.

  • The RFI cites Executive Orders 14154, 14179, 14262 and 14302.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.