Write the Version 2.0 thresholds into UPS procurement as a floor; for VFI units above 10,000 W compute the minimum from 0.0058 x ln(P) + 0.886 for the actual rating.
Modular UPSs in the 1,500-10,000 W range receive an efficiency allowance (EMOD) of 0.004.
Use the regional and size-based values for first-pass PUE assumptions, but treat them as 2018-and-earlier averages and as historical context, not as a current target.
German PUE in 2015: 2.1 for server rooms under 100 m2, 1.9 for 100-500 m2, 1.7 for 500-5,000 m2, 1.6 above 5,000 m2.
Default the cooling module's supply-air setpoint for colo profiles to 27 degC (upper end of the ASHRAE recommended 18-27 degC), with a sensitivity chart of PUE and economizer hours versus setpoint (e.g. 22 to 27 degC).
Renewable coverage above 90% since 2018; 95% in 2021.
For site selection, look beyond the 100-year flood to the 500-year (0.2%) flood and the facility's occupancy category, and avoid flood hazard areas where possible.
A freeboard of 1 to 3 feet above the flood elevation is often applied to critical facilities.
At critical-facility data centers, place generators, ATS, fuel tanks and pumps above the greatest of BFE + 3 ft, DFE + 1 ft and 500-year elevation + 1 ft, and prefer elevation to dry floodproofing.
Generators over 300 kW are almost exclusively diesel-fueled.
For cooling design use a station's hourly dry-bulb and wet-bulb (or dew point) data to count free-cooling and economiser hours in 1 degree C bins; SoSo CAD builds annual 1 degree C dry-bulb and wet-bulb hour bins for this purpose from one year of station files.
Over 14,000 active stations are updated daily; online data are typically delayed 24 hours.
In the efficiency dashboard show three PUE references: design PUE, partial-load PUE (at 25/50/75% IT load) and benchmarks (Google 1.09 hyperscale; Uptime 1.54 industry).
2025 fleet-wide TTM PUE 1.09; 2025 quarterly values 1.08-1.11.
In the cooling-selection UX present an explicit energy-versus-water trade-off (PUE versus WUE) per site, with a water-stress input (for example a WRI Aqueduct category).
87% of 2025 freshwater withdrawal from sources at low or medium depletion/scarcity risk.
Set up the commissioning plan at the start of a data center project: review the OPR and basis of design with the CxP and write measurable performance targets.
At 10 months into a 12-month warranty period the CxP, operations office and CMa review systems for warranty repairs.
Write the PG25 or PG55 choice into the fluid specification according to the freeze protection the climate needs, and record that keeping glycol above 25% by volume removes the need for biocide.
Maximum corrosion rates under ASTM D8040-17: copper 0.22 mpy (5 mg/coupon), brass 0.46 mpy (10 mg/coupon).
Add the indirect evaporative cooler (IEC) as a plant type, with parameters for approach temperature, wet-bulb effectiveness, trim DX capacity fraction and water use only during evaporative hours.
With evaporative assist: 4,394 h (50%) at 21.1 C; 6,289 h (72%) at 27 C.