1,044 sources

Sources

889–912 / 1,044 sources

Technical guidePDF

U.S. EPA / ENERGY STAR 2017

ENERGY STAR Program Requirements for Uninterruptible Power Supplies (UPSs) - Partner Commitments, Eligibility Criteria Version 2.0, and Test Method (Rev. Dec-2017)

Write the Version 2.0 thresholds into UPS procurement as a floor; for VFI units above 10,000 W compute the minimum from 0.0058 x ln(P) + 0.886 for the actual rating.

  • Modular UPSs in the 1,500-10,000 W range receive an efficiency allowance (EMOD) of 0.004.
Technical guidePDF

European Commission, DG Communications Networks, Content and Technology (DG CONNECT) 2020

Energy-efficient Cloud Computing Technologies and Policies for an Eco-friendly Cloud Market: Final Study Report (SMART 2018/0028)

Use the regional and size-based values for first-pass PUE assumptions, but treat them as 2018-and-earlier averages and as historical context, not as a current target.

  • German PUE in 2015: 2.1 for server rooms under 100 m2, 1.9 for 100-500 m2, 1.7 for 500-5,000 m2, 1.6 above 5,000 m2.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

Technical guideFree to read

NOAA National Centers for Environmental Information (NCEI) 2016

Global Surface Hourly / Integrated Surface Database (ISD), dataset C00532 - ISO 19115-2 metadata record

For cooling design use a station's hourly dry-bulb and wet-bulb (or dew point) data to count free-cooling and economiser hours in 1 degree C bins; SoSo CAD builds annual 1 degree C dry-bulb and wet-bulb hour bins for this purpose from one year of station files.

  • Over 14,000 active stations are updated daily; online data are typically delayed 24 hours.
Technical guidePDF

U.S. General Services Administration (Public Buildings Service) 2020

GSA Commissioning Guide (September 2020)

Set up the commissioning plan at the start of a data center project: review the OPR and basis of design with the CxP and write measurable performance targets.

  • At 10 months into a 12-month warranty period the CxP, operations office and CMa review systems for warranty repairs.
White paperPDF

Open Compute Project Foundation Year not stated

Guidelines for Using Propylene Glycol-Based Heat Transfer Fluids in Single-Phase Cold Plate-Based Liquid Cooled Racks (OCP white paper)

Write the PG25 or PG55 choice into the fluid specification according to the freeze protection the climate needs, and record that keeping glycol above 25% by volume removes the need for biocide.

  • Maximum corrosion rates under ASTM D8040-17: copper 0.22 mpy (5 mg/coupon), brass 0.46 mpy (10 mg/coupon).

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.