White paperFree to read

Schneider Electric 2015

Data Center Projects: Establishing a Floor Plan

Run the layout engine on a 600 mm / 2 ft grid with row-pair pitch presets A-D (14/16/16/18 ft), auto-selected from raised-floor, rear-door accessory, containment and density inputs.

  • Rack-location estimate: room area / 28 sq ft (2.6 m2) per rack.
White paperFree to read

Schneider Electric 2013

Data Center Projects: System Planning

Build an intake wizard that makes the six parameters (criticality/Tier, IT kW, growth ramp with uncertainty, target PUE, average and peak kW/rack, capex budget) required before layout tools unlock, with live trade-offs between them.

  • Preferences are adjustable (overhead power cabling, wide racks); constraints are hard (slab height, floor load, columns, codes, TIA 942, work rules, elevator weight capacity).
Research paperPDF

Energy Efficiency (Springer Science and Business Media LLC) 2019

Data centres in future European energy systems—energy efficiency, integration and policy

In waste-heat sales, set outlet temperature by cooling technology (air 25-35 °C, liquid up to 60 °C, two-phase up to 90 °C) and check heat-pump requirement against the district-heating generation (45-55 °C for 4G).

  • Fourth-generation district heating can run with supply temperatures of 45 to 55 °C.
Technical guidePDF

U.S. Department of Energy / Federal Register 2025

Accelerating Speed to Power/Winning the Artificial Intelligence Race: Federal Action To Rapidly Expand Grid Capacity and Enable Electricity Demand Growth (Request for Information, September 18, 2025)

When planning a large load connection, query the interconnection queue, transmission congestion and reconductoring potential for the relevant grid region early.

  • The RFI cites Executive Orders 14154, 14179, 14262 and 14302.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.