Create separate Organizational Profiles for a facility's IT, OT and building management systems (for example electrical and cooling SCADA/BMS) and state each Profile's scope.
The Core has 22 Categories with Subcategories; the outcomes are not a checklist.
Keep embodied-carbon amortisation (TE x T/EL) in procurement, refresh and design-option comparisons, and use operational carbon only for runtime placement and scheduling recommendations.
Scheduling by SCI raised datacenter carbon by nearly 30%; the penalty was over 15% at 40-80% utilisation.
When the user raises the inlet setpoint, include server fan power and airflow increase (flat/low/moderate/high CFM-vs-inlet curve) and CRAH fan and count changes; warn when PUE improves but total energy rises.
TCO unchanged, 6% better and 6% worse respectively.
Define AI load not only by energy but by peak/average (about 1 in training), peak/idle ratio and ramp/decline rates; make sub-second dynamics inputs for UPS, generator and grid-connection studies.
Traditional computing is 10-15 kW/rack versus 30+ kW/rack for AI workloads.
Add passive and active ducted racks and ducted HACS to the containment selector, with density limits tied to a ceiling plenum vacuum input (default 0.03 inH2O / 7.5 Pa, warning above 0.06 inH2O / 15 Pa).
Cooling-to-IT airflow ratio: 1 for HACS, 1.2 or higher for ducted racks.
Compare HVAC options not only by on-site water use but by total water footprint including the grid's water intensity (WUEsource); the ranking can flip with the grid.
Outbound data traffic carries a water footprint of 1-205 litres per gigabyte; the high end is close to the 214 L footprint of 1 kg of tomatoes.
In a design tool, set CFD accuracy expectations from this review's ranges (0.1-4 °C absolute, relative mostly below 20%) and do not limit validation scope to temperature; ask for velocity and pressure too.
Of the 58 CFD studies, Fluent was used in 24 (41.4%) and 6SigmaDC in 12; standard k-epsilon in 41 (about 70.7%).
For paralleled modules in a modular UPS, do not look only at the N+1 redundancy count; add to the design check that module-to-module filter and control parameter differences cause circulating current and thermal imbalance.
The authors recommend keeping overshoot or sag on module switching within 10% of nominal critical-bus voltage.
In preliminary cooling selection, make climate (humidity, haze/dust) and the free-cooling switchover point decisive inputs; direct airside economisers may be unsuitable in haze- and dust-prone regions.
An indirect evaporative cooling unit in Shenzhen achieved a PUE of 1.249 at 5.3 kW per cabinet.
Calculate the permissible time for a cooling outage with a pipe-volume energy balance and set the backup-cooling start time accordingly (here 300 s); high-temperature, contained designs give less time.
From 18 °C chilled water and 25 °C supply air, coil capacity fell below the load and inlet temperatures rose rapidly.
When evaluating turning liquid-cooled data-centre waste heat into electricity, weigh RTE (76-83%) against specific cost (767-1125 USD/kWh); higher RTE can come with a cost increase.
System cost is about 767-796 USD/kWh depending on the cycle combination.
In large-load interconnection negotiation, present AI load flexibility (a deferral window of up to about 3 hours) as a lever for interconnection capacity and timing; returns diminish beyond 3 hours.
In the IEEE 14-bus study, data centres on buses connected to congested lines benefit most from geographic load shifting.