1,044 sources

Sources

625–648 / 1,044 sources

White paperFree to read

Schneider Electric 2019

Solving Edge Computing Infrastructure Challenges

Provide an edge/micro data centre template: single-rack bundle of rack, UPS, rack PDU, cooling (passive default), sensors and cameras.

  • Prefabricated modules save about 50% of design and engineering time (WP 163).
Technical guideFree to read

TMMOB Makina Mühendisleri Odası (MMO) 2019

Fire extinguishing system functions and integration with other engineering disciplines (Söndürme Sistemleri Fonksiyonları, Diğer Mühendislik Disiplinleri ile Entegrasyonu)

When a room uses gaseous suppression, require HVAC damper/fan shutdown interlocks, a pressure-relief vent and a 10-minute hold-time integrity test in the commissioning list.

  • For clean-agent rooms, the minimum extinguishing concentration should be held for at least 10 minutes, verified by room integrity testing.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

Technical guideFree to read

ABB Year not stated

Standard requirements for selectivity

In a selectivity study, present curve overlap and current-ratio checks only as screening tools.

  • The distinction is discussed in the context of IEC/TR 61912-2 and IEC 60947-2 Annex A.
Research paperPDF

IEEE Open Journal of Power Electronics (Institute of Electrical and Electronics Engineers (IEEE)) 2026

State-of-the-Art Power Electronics in AI Data Centers

In rack power templates, model PSU count per shelf and the 33 kW shelf limit for AC distribution, and check busbar, PDU and cooling impact together for racks that exceed 100 kW with several shelves.

  • AI rack density is 30-100+ kW against 7-10 kW for traditional racks; an 8-GPU DGX H100 draws around 10,200 W.
Research paperFree to read

Revista de Informática Teórica e Aplicada (Universidade Federal do Rio Grande do Sul) 2019

Stochastic Models for Optimizing Availability, Cost and Sustainability of Data Center Power Architectures through Genetic Algorithm

Recognise that topology choice is only part of availability; equipment selection within a fixed topology can trade availability, losses and cost.

  • Tier I: cost 122,322.20 to 116,004.52 USD (5.16%), exergy 203.39 to 140.13 J (31.10%), availability 3.3643 to 3.4005 nines.
Research paperPDF

Sustainability (MDPI AG) 2021

Strategies for Improving the Sustainability of Data Centers via Energy Mix, Energy Conservation, and Circular Energy

Calculate UPS load ratio (80% for 800 kW in a modular arrangement, 53% in parallel-redundant) and losses at design stage; consider specifying UPS efficiency at 30% load and compare a SiC-based power stage (above 98%).

  • CUE is defined as total CO2 emissions over ICT energy, or equivalently the CO2 emission factor × PUE.
Research paperPDF

IEEE Open Journal of Industry Applications (Institute of Electrical and Electronics Engineers (IEEE)) 2025

Study of DC Arc Flash Phenomenon From 1000 V Lithium Ion Battery Systems

In arc flash estimation for high-voltage battery rooms, do not use the maximum-power method alone with an enclosure multiplier; cross-check unrealistic results with measurement-based models such as Ammerman's.

  • 91 arc-flash experiments were performed on LFP and LTO lithium-ion battery sources at voltages up to roughly 1000 VDC.
Research paperPDF

Journal of Cleaner Production (Elsevier BV) 2025

Sustainable AI infrastructure: A scenario-based forecast of water footprint under uncertainty

In water-footprint planning, calculate on-site (WUE), off-site electricity (PUE × EWIF) and embodied hardware water as separate items.

  • Under BAU, water demand rises nearly sevenfold between 2030 and 2050; improvements in WUE, EWIF and embodied water could cut 2050 use by up to 95% against BAU.
Research paperPDF

Sustainability (MDPI AG) 2026

Sustainable Grid Integration of AI Data Centers: Carbon-Aware Co-Optimization of Training Workloads and Battery Storage Under Renewable Uncertainty

Do not size behind-the-meter battery storage on an emission-reduction case; round-trip losses mean storage alone adds nothing and can raise emissions. Justify it with a concrete duty such as masking checkpoint dips.

  • The modelled AI fleet drew about 627 MWh/day (about 152 t/day CO2); flexibility abated 39 t/day, about 26% of the fleet's own emissions.
Technical guidePDF

European Commission, DG CNECT (EY, Borderstep Institute, AIT, RP legalitax) 2025

Synergies between Data Centres and Energy Systems - Final Report (European Commission, DG CNECT)

When choosing cooling architecture assess waste heat temperature early: liquid cooling gives higher temperatures, even air cooling can give about 30-35 C as a heat-pump source; position the heat pump for the receiving network temperature (60-80 C or 4th/5th generation).

  • In the stakeholder survey, over 60% rated heat reuse technically viable today but only about 20% economically viable.
Research paperFree to read

arXiv preprint (Microsoft Azure Research / University of Illinois) 2025

TAPAS: Thermal- and Power-Aware Scheduling for LLM Inference in Cloud Platforms

Couple thermal and power headroom in the design tool: show how inlet temperature rise with outdoor conditions (for economiser or adiabatic systems) erodes GPU thermal margin and can trigger throttling.

  • GPU temperature must stay below a threshold (for example 85 C) beyond which hardware throttles computation.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.